13.07.2015 Views

Master Plan Development - City of Boca Raton

Master Plan Development - City of Boca Raton

Master Plan Development - City of Boca Raton

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>City</strong> <strong>of</strong> <strong>Boca</strong> <strong>Raton</strong> Stormwater Management <strong>Master</strong> <strong>Plan</strong>Part I – Task 3 ReportG. Other System ImprovementsThe drainage complaint log and discussions with the <strong>City</strong> included a number <strong>of</strong> reports <strong>of</strong> isolatedponding, driveway flooding, and cul-de-sac flooding. Many <strong>of</strong> these were evaluated in the WHS report <strong>of</strong>1998. Review <strong>of</strong> the WHS report, confirmed by field observation, indicated that in some instances,property owners have simply failed to maintain the swale that serves them, or otherwise altered the swalearea or driveway in such a manner as to cause the ponding that generated the complaint. In many cul-desacareas, redevelopment has eliminated the overland flow routes that stormwater run<strong>of</strong>f once used,thereby trapping water in the streets. It is recommended that these issues be evaluated and addressed on acase-by-case basis. In order to allow for these efforts, two additional, annually recurring, capitalimprovement programs are recommended below. These recurring projects will allow the <strong>City</strong> to plan forand address new problem areas on a continuing basis.Swale Restoration ProgramBecause the swale degradation issue is widespread in location, and because experience reveals that manyswales will continue to become non-functional as a result <strong>of</strong> homeowner activities (landscaping, lack <strong>of</strong>maintenance, etc.), an ongoing, systematic swale restoration program is proposed as a recurringimprovement project for the <strong>City</strong>. It is further recommended that this program include an annual review<strong>of</strong> outstanding drainage complaints to determine which swales will be restored in the upcoming year.This planning activity should be carried out at the start <strong>of</strong> the calendar year, in order to be included as aspecific annual improvement project in the budget for the subsequent fiscal year.Cul-de-sac Rehabilitation ProgramField observation <strong>of</strong> a number <strong>of</strong> cul-de-sacs indicated that either when they were constructed, or as aresult <strong>of</strong> repaving/resurfacing, no positive drainage exists for these areas. The optimum solution for each<strong>of</strong> these cul-de-sacs must be considered on a case-by-case basis. It is again recommended that a recurringannual budget line item be included in the stormwater utility budget. This planning activity should becarried out at the start <strong>of</strong> the calendar year, in order to be included as a specific annual improvementproject in the budget for the subsequent fiscal year.L:\boca\bocaswmp\A6016.03\rp02accm.docPage 62MOCK•ROOS

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!