13.07.2015 Views

Master Plan Development - City of Boca Raton

Master Plan Development - City of Boca Raton

Master Plan Development - City of Boca Raton

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>City</strong> <strong>of</strong> <strong>Boca</strong> <strong>Raton</strong> Stormwater Management <strong>Master</strong> <strong>Plan</strong>Part I – Task 3 ReportSpanish River Road Stormwater Management System ImprovementsEngineer’s Opinion <strong>of</strong> Conceptual Costs<strong>City</strong> <strong>of</strong> <strong>Boca</strong> <strong>Raton</strong> Stormwater Management <strong>Master</strong> <strong>Plan</strong>ITEM DESCRIPTION QTY UNIT UNIT PRICE TOTAL1. Mobilization 1 LS $25,000 $25,0002. Maintenance <strong>of</strong> Traffic 1 LS $20,000 $20,0003. Preconstruction Video 1 LS $6,000 $6,0004. Survey & Layout 1 LS $24,000 $24,0005. Record Drawings 1 LS $6,000 $6,0006. Clearing & Grubbing 1 LS $10,000 $10,0007. Remove Type D Curb 50 LF $10 $5008. Inlet, Type C 2 EA $4,000 $8,0009. Manhole, Type 7 1 EA $5,000 $5,00010. Connect to Exist. Inlet 1 EA $2,500 $2,50011. Reinforced Concrete Pipe, 18" 225 LF $60 $13,50012. Concrete Type D Curb 50 LF $15 $75013. Pavement Restoration (Pipe Crossings) 280 SY $35 $9,80014. Pavement Overbuild (2.3" Avg.) 1675 TN $120 $201,00015. Restore Paver Brick Driveway 125 SF $10 $1,25016. Reconstruct Speed Humps 8 EA $1,000 $8,00017. Sodding (Floritam) 75 SY $6 $45018. Remove & Replace Traffic Sign 1 EA $250 $25019. Replace Pavement Markings 1 LS $200 $20020. Irrigation Restoration 1 LS $338 $338Subtotal $342,538Contingency (15%) $51,381Construction Total $393,918Engineering, Legal, & Misc. Costs (20%) $78,784Rounded Project Total $480,000Note: The above costs are based on a conceptual layout <strong>of</strong> the stormwater system for this area.As such, they are subject to change depending on the final scope <strong>of</strong> the project that is designedand constructed as well as other factors. Estimate is in 2008 dollars.L:\boca\bocaswmp\A6016.03\rp02accm.docPage 54MOCK•ROOS

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!