13.07.2015 Views

Master Plan Development - City of Boca Raton

Master Plan Development - City of Boca Raton

Master Plan Development - City of Boca Raton

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>City</strong> <strong>of</strong> <strong>Boca</strong> <strong>Raton</strong> Stormwater Management <strong>Master</strong> <strong>Plan</strong>Part I – Task 3 ReportUniversity Heights Stormwater System ImprovementsEngineer’s Opinion <strong>of</strong> Conceptual Costs<strong>City</strong> <strong>of</strong> <strong>Boca</strong> <strong>Raton</strong> Stormwater Management <strong>Master</strong> <strong>Plan</strong>ITEM DESCRIPTION QTY UNIT UNIT PRICE TOTAL1. Mobilization 1 LS $5,000 $5,0002. Maintenance <strong>of</strong> Traffic 1 LS $3,000 $3,0003. Preconstruction Video 1 LS $200 $2004. Survey & Layout 1 LS $800 $8005. Record Drawings 1 LS $200 $2006. Clearing & Grubbing 1 LS $5,000 $5,0007. Inlet, Type C 5 EA $4,000 $20,0008. Exfiltration Trench, 18" RCP 150 LF $120 $18,0009. Reinforced Concrete Pipe, 18" 75 LF $60 $4,50010. Pavement Restoration (Pipe Crossings) 100 SY $35 $3,50011. Sodding (Floritam) 200 SY $6 $1,20012. Remove & Replace Traffic Sign 1 EA $250 $25013. Replace Pavement Markings 1 LS $200 $20014. Irrigation Restoration 1 LS $900 $900Subtotal $62,750Contingency (15%) $9,413Construction Total $72,163Engineering, Legal, & Misc. Costs (20%) $14,433Rounded Project Total $87,000Note: The above costs are based on a conceptual layout <strong>of</strong> the stormwater system for this area.As such, they are subject to change depending on the final scope <strong>of</strong> the project that is designedand constructed as well as other factors. Estimate is in 2008 dollars.L:\boca\bocaswmp\A6016.03\rp02accm.docPage 34MOCK•ROOS

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!