13.07.2015 Views

Master Plan Development - City of Boca Raton

Master Plan Development - City of Boca Raton

Master Plan Development - City of Boca Raton

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>City</strong> <strong>of</strong> <strong>Boca</strong> <strong>Raton</strong> Stormwater Management <strong>Master</strong> <strong>Plan</strong>Part I – Task 3 ReportNew Pines Stormwater Community Improvement ProjectEngineer’s Opinion <strong>of</strong> Conceptual Costs<strong>City</strong> <strong>of</strong> <strong>Boca</strong> <strong>Raton</strong> Stormwater Management <strong>Master</strong> <strong>Plan</strong>ITEM DESCRIPTION QTY UNIT UNIT PRICE TOTAL1. Mobilization 1 LS $20,000 $20,0002. Maintenance <strong>of</strong> Traffic 1 LS $20,000 $20,0003. Preconstruction Video 1 LS $3,550 $3,5504. Survey & Layout 1 LS $14,200 $14,2005. Record Drawings 1 LS $3,550 $3,5506. Clearing & Grubbing 1 LS $10,000 $10,0007. Final Grading 16700 SY $3 $50,1008. Excavation 2350 CY $15 $35,2509. Sodding (Floritam) 16700 SY $6 $100,20019. Remove & Replace Traffic Sign 8 EA $250 $2,00020. Replace Pavement Markings 1 LS $1,000 $1,00021. Irrigation Restoration 1 LS $75,150 $75,15022. Relocate Mailbox 250 EA $50 $12,500Subtotal $347,500Contingency (15%) $52,125Construction Total $399,625Engineering, Legal, & Misc. Costs (20%) $79,925Rounded Project Total $480,000Note: The above costs are based on a conceptual layout <strong>of</strong> the stormwater system for this area.As such, they are subject to change depending on the final scope <strong>of</strong> the project that is designedand constructed as well as other factors. Estimate is in 2008 dollars.L:\boca\bocaswmp\A6016.03\rp02accm.docPage 58MOCK•ROOS

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!