Master Plan Development - City of Boca Raton
Master Plan Development - City of Boca Raton
Master Plan Development - City of Boca Raton
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>City</strong> <strong>of</strong> <strong>Boca</strong> <strong>Raton</strong> Stormwater Management <strong>Master</strong> <strong>Plan</strong>Part I – Task 3 ReportPalm Beach Farms Stormwater Management ImprovementsEngineer’s Opinion <strong>of</strong> Conceptual Costs<strong>City</strong> <strong>of</strong> <strong>Boca</strong> <strong>Raton</strong> Stormwater Management <strong>Master</strong> <strong>Plan</strong>ITEM DESCRIPTION QTY UNIT UNIT PRICE TOTAL1. Mobilization 1 LS $25,000 $25,0002. Maintenance <strong>of</strong> Traffic 1 LS $10,000 $10,0003. Preconstruction Video 1 LS $1,700 $1,7004. Survey & Layout 1 LS $6,800 $6,8005. Record Drawings 1 LS $1,700 $1,7006. Clearing & Grubbing 1 LS $10,000 $10,0009. Inlet, Type C 7 EA $4,000 $28,00010. Manhole, Type 7 4 EA $5,000 $20,00011. Exfiltration Trench, 18" RCP 1500 LF $120 $180,00012. Reinforced Concrete Pipe, 18" 175 LF $60 $10,50013. Penetrate Existing Seawall 1 LS $5,000 $5,00014. Concrete Driveway Restoration 250 SY $50 $12,50015. Asphalt Driveway Restoration 100 SY $40 $4,00016. Pavement Restoration (Pipe Crossings) 225 SY $35 $7,87517. Pavement Overbuild (Intersections) 10 TN $200 $2,00018. Sodding (Floritam) 2300 SY $6 $13,80019. Remove & Replace Traffic Sign 4 EA $250 $1,00020. Replace Pavement Markings 1 LS $500 $50021. Irrigation Restoration 1 LS $10,350 $10,350Subtotal $350,725Contingency (15%) $52,609Construction Total $403,334Engineering, Legal, & Misc. Costs (20%) $80,667Rounded Project Total $490,000Note: The above costs are based on a conceptual layout <strong>of</strong> the stormwater system for this area.As such, they are subject to change depending on the final scope <strong>of</strong> the project that is designedand constructed as well as other factors. Estimate is in 2008 dollars.L:\boca\bocaswmp\A6016.03\rp02accm.docPage 50MOCK•ROOS