13.07.2015 Views

Master Plan Development - City of Boca Raton

Master Plan Development - City of Boca Raton

Master Plan Development - City of Boca Raton

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>City</strong> <strong>of</strong> <strong>Boca</strong> <strong>Raton</strong> Stormwater Management <strong>Master</strong> <strong>Plan</strong>Part I – Task 3 ReportPalm Beach Farms Stormwater Management ImprovementsEngineer’s Opinion <strong>of</strong> Conceptual Costs<strong>City</strong> <strong>of</strong> <strong>Boca</strong> <strong>Raton</strong> Stormwater Management <strong>Master</strong> <strong>Plan</strong>ITEM DESCRIPTION QTY UNIT UNIT PRICE TOTAL1. Mobilization 1 LS $25,000 $25,0002. Maintenance <strong>of</strong> Traffic 1 LS $10,000 $10,0003. Preconstruction Video 1 LS $1,700 $1,7004. Survey & Layout 1 LS $6,800 $6,8005. Record Drawings 1 LS $1,700 $1,7006. Clearing & Grubbing 1 LS $10,000 $10,0009. Inlet, Type C 7 EA $4,000 $28,00010. Manhole, Type 7 4 EA $5,000 $20,00011. Exfiltration Trench, 18" RCP 1500 LF $120 $180,00012. Reinforced Concrete Pipe, 18" 175 LF $60 $10,50013. Penetrate Existing Seawall 1 LS $5,000 $5,00014. Concrete Driveway Restoration 250 SY $50 $12,50015. Asphalt Driveway Restoration 100 SY $40 $4,00016. Pavement Restoration (Pipe Crossings) 225 SY $35 $7,87517. Pavement Overbuild (Intersections) 10 TN $200 $2,00018. Sodding (Floritam) 2300 SY $6 $13,80019. Remove & Replace Traffic Sign 4 EA $250 $1,00020. Replace Pavement Markings 1 LS $500 $50021. Irrigation Restoration 1 LS $10,350 $10,350Subtotal $350,725Contingency (15%) $52,609Construction Total $403,334Engineering, Legal, & Misc. Costs (20%) $80,667Rounded Project Total $490,000Note: The above costs are based on a conceptual layout <strong>of</strong> the stormwater system for this area.As such, they are subject to change depending on the final scope <strong>of</strong> the project that is designedand constructed as well as other factors. Estimate is in 2008 dollars.L:\boca\bocaswmp\A6016.03\rp02accm.docPage 50MOCK•ROOS

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!