13.07.2015 Views

Master Plan Development - City of Boca Raton

Master Plan Development - City of Boca Raton

Master Plan Development - City of Boca Raton

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Task 1 Deliverables – The CONSULTANT will prepare an interim report summarizing theexisting conditions <strong>of</strong> the CITY’s stormwater system. The report will include the followingexhibits:• SFWMD permit map within the CITY• CITY’s stormwater system map (including FDOT & PBC systems)• Identified problem areas (from citizen complaints & CITY information)• LIDAR map• Land Use map• Drainage Basin map (overlayed with SFWMD sub-basins, NPDES basin areas, and/orFDEP TMDL watersheds)• MS4 major outfall drainage areas map• High risk facilities location map• Septic system service map• Existing water quantity levels <strong>of</strong> service• Existing water quality levels <strong>of</strong> service• Private system stormwater management areasA draft <strong>of</strong> the interim report (four copies) will be provided to the CITY. TheCONSULTANT will meet with CITY (one meeting up to two hours in duration) to receiveand discuss comments. All comments will be incorporated into a final interim report onexisting conditions. Four hard copies and one electronic (PDF) file on CD will be provided.The CONSULTANT will also provide to the CITY any GIS shapefile and associateddatabase that is created as a result <strong>of</strong> Task 1 services.TASK 2 – REGULATORY INFORMATION SUMMARYTask 2.A – Summarize Current Stormwater PolicyTask 2.A.1 The CONSULTANT will evaluate the following policies/regulations andsummarize the requirements, goals, and policies which are currently used to evaluate theperformance (water quantity and water quality) <strong>of</strong> new stormwater management systems:• CITY’s Comprehensive <strong>Plan</strong> Drainage Sub-Element• CITY’s Land <strong>Development</strong> Code• SFWMD regulatory requirements• LWDD requirements including LOS provided by LWDD canals• PBC MS4 NPDES permitTask 2.A.2 The CONSULTANT will summarize any issues that could result fromapplying these additional/revised development standards to existing infrastructure.L/bocaswmp/a6016.01/InterimReport 11-27-07/r02Page 4MOCK•ROOS

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!