13.07.2015 Views

Master Plan Development - City of Boca Raton

Master Plan Development - City of Boca Raton

Master Plan Development - City of Boca Raton

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>City</strong> <strong>of</strong> <strong>Boca</strong> <strong>Raton</strong> Stormwater Management <strong>Master</strong> <strong>Plan</strong>Part I – Task 3 ReportOld Floresta Area Stormwater Management ImprovementsEngineer’s Opinion <strong>of</strong> Conceptual Costs<strong>City</strong> <strong>of</strong> <strong>Boca</strong> <strong>Raton</strong> Stormwater Management <strong>Master</strong> <strong>Plan</strong>ITEM DESCRIPTION QTY UNIT UNIT PRICE TOTAL1. Mobilization 1 LS $15,000 $15,0002. Maintenance <strong>of</strong> Traffic 1 LS $5,000 $5,0003. Preconstruction Video 1 LS $1,500 $1,5004. Survey & Layout 1 LS $5,000 $5,0005. Record Drawings 1 LS $1,500 $1,5006. Clearing & Grubbing 1 LS $15,000 $15,0007. Pervious Pavement 2950 SY $60 $177,0008. Remove & Replace Traffic Sign 4 EA $200 $8009. Replace Pavement Markings 1 LS $400 $400Subtotal $221,200Contingency (15%) $33,180Construction Total $254,380Engineering, Legal, & Misc. Costs (20%) $50,876Rounded Project Total $310,000Note: The above costs are based on a conceptual layout <strong>of</strong> the stormwater system for this area. As such, theyare subject to change depending on the final scope <strong>of</strong> the project that is designed and constructed as well asother factors. Estimate is in 2008 dollars.L:\boca\bocaswmp\A6016.03\rp02accm.docPage 16MOCK•ROOS

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!