Master Plan Development - City of Boca Raton
Master Plan Development - City of Boca Raton
Master Plan Development - City of Boca Raton
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>City</strong> <strong>of</strong> <strong>Boca</strong> <strong>Raton</strong> Stormwater Management <strong>Master</strong> <strong>Plan</strong>Part I – Task 3 ReportNew Floresta Stormwater Management System ImprovementsEngineer’s Opinion <strong>of</strong> Conceptual Costs<strong>City</strong> <strong>of</strong> <strong>Boca</strong> <strong>Raton</strong> Stormwater Management <strong>Master</strong> <strong>Plan</strong>ITEM DESCRIPTION QTY UNIT UNIT PRICE TOTAL1. Mobilization 1 LS $25,000 $25,0002. Maintenance <strong>of</strong> Traffic 1 LS $10,000 $10,0003. Preconstruction Video 1 LS $1,500 $1,5004. Survey & Layout 1 LS $5,000 $5,0005. Record Drawings 1 LS $1,500 $1,5006. Clearing & Grubbing 1 LS $10,000 $10,0007. Remove Exist. Sidewalk 6200 SF $2 $12,4008. Remove Exist. Header Curb 30 LF $10 $3009. Inlet, Type C 6 EA $4,000 $24,00010. Connect to Exist. Inlet 1 EA $2,500 $2,50011. Exfiltration Trench, 18" RCP 1200 LF $120 $144,00012. Reinforced Concrete Pipe, 18" 150 LF $60 $9,00013. Concrete Sidewalk 700 SY $40 $28,00014. Header Curb 30 LF $15 $45015. Pavement Restoration (Pipe Crossings) 275 SY $35 $9,62516. Pavement Restoration (South Lane) 1500 SY $25 $37,50017. Sodding (Floritam) 1350 SY $6 $8,10018. Remove & Replace Traffic Sign 1 EA $250 $25019. Replace Pavement Markings 1 LS $200 $20020. Irrigation Restoration 1 LS $6,075 $6,075Subtotal $335,400Contingency (15%) $50,310Construction Total $385,710Engineering, Legal, & Misc. Costs (20%) $77,142Rounded Project Total $470,000Add Operable Control Structure 1 EA $30,000 $30,000Alternate Project Total $500,000Note: The above costs are based on a conceptual layout <strong>of</strong> the stormwater system for this area. As such, theyare subject to change depending on the final scope <strong>of</strong> the project that is designed and constructed as well asother factors. Estimate is in 2008 dollars.L:\boca\bocaswmp\A6016.03\rp02accm.docPage 8MOCK•ROOS