13.07.2015 Views

Master Plan Development - City of Boca Raton

Master Plan Development - City of Boca Raton

Master Plan Development - City of Boca Raton

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>City</strong> <strong>of</strong> <strong>Boca</strong> <strong>Raton</strong> Stormwater Management <strong>Master</strong> <strong>Plan</strong>Part I – Task 3 ReportNew Floresta Stormwater Management System ImprovementsEngineer’s Opinion <strong>of</strong> Conceptual Costs<strong>City</strong> <strong>of</strong> <strong>Boca</strong> <strong>Raton</strong> Stormwater Management <strong>Master</strong> <strong>Plan</strong>ITEM DESCRIPTION QTY UNIT UNIT PRICE TOTAL1. Mobilization 1 LS $25,000 $25,0002. Maintenance <strong>of</strong> Traffic 1 LS $10,000 $10,0003. Preconstruction Video 1 LS $1,500 $1,5004. Survey & Layout 1 LS $5,000 $5,0005. Record Drawings 1 LS $1,500 $1,5006. Clearing & Grubbing 1 LS $10,000 $10,0007. Remove Exist. Sidewalk 6200 SF $2 $12,4008. Remove Exist. Header Curb 30 LF $10 $3009. Inlet, Type C 6 EA $4,000 $24,00010. Connect to Exist. Inlet 1 EA $2,500 $2,50011. Exfiltration Trench, 18" RCP 1200 LF $120 $144,00012. Reinforced Concrete Pipe, 18" 150 LF $60 $9,00013. Concrete Sidewalk 700 SY $40 $28,00014. Header Curb 30 LF $15 $45015. Pavement Restoration (Pipe Crossings) 275 SY $35 $9,62516. Pavement Restoration (South Lane) 1500 SY $25 $37,50017. Sodding (Floritam) 1350 SY $6 $8,10018. Remove & Replace Traffic Sign 1 EA $250 $25019. Replace Pavement Markings 1 LS $200 $20020. Irrigation Restoration 1 LS $6,075 $6,075Subtotal $335,400Contingency (15%) $50,310Construction Total $385,710Engineering, Legal, & Misc. Costs (20%) $77,142Rounded Project Total $470,000Add Operable Control Structure 1 EA $30,000 $30,000Alternate Project Total $500,000Note: The above costs are based on a conceptual layout <strong>of</strong> the stormwater system for this area. As such, theyare subject to change depending on the final scope <strong>of</strong> the project that is designed and constructed as well asother factors. Estimate is in 2008 dollars.L:\boca\bocaswmp\A6016.03\rp02accm.docPage 8MOCK•ROOS

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!