13.07.2015 Views

Master Plan Development - City of Boca Raton

Master Plan Development - City of Boca Raton

Master Plan Development - City of Boca Raton

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>City</strong> <strong>of</strong> <strong>Boca</strong> <strong>Raton</strong> Stormwater Management <strong>Master</strong> <strong>Plan</strong>Part I – Task 3 ReportNW 36th Court Stormwater System ImprovementsEngineer’s Opinion <strong>of</strong> Conceptual Costs<strong>City</strong> <strong>of</strong> <strong>Boca</strong> <strong>Raton</strong> Stormwater Management <strong>Master</strong> <strong>Plan</strong>ITEM DESCRIPTION QTY UNIT UNIT PRICE TOTAL1. Mobilization 1 LS $5,000 $5,0002. Maintenance <strong>of</strong> Traffic 1 LS $3,000 $3,0003. Preconstruction Video 1 LS $200 $2004. Survey & Layout 1 LS $600 $6005. Record Drawings 1 LS $200 $2006. Clearing & Grubbing 1 LS $5,000 $5,0007. Remove Exist. Sidewalk 550 SF $2 $1,1008. Inlet, Type C 3 EA $4,000 $12,0009. Exfiltration Trench, 18" RCP 135 LF $120 $16,20010. Reinforced Concrete Pipe, 18" 30 LF $60 $1,80011. Concrete Sidewalk 60 SY $40 $2,40012. Concrete Driveway 35 SY $50 $1,75013. Pavement Restoration (Pipe Crossing) 30 SY $35 $1,05014. Sodding (Floritam) 1150 SY $6 $6,90015. Irrigation Restoration 1 LS $5,175 $5,175Subtotal $62,375Contingency (15%) $9,356Construction Total $71,731Engineering, Legal, & Misc. Costs (20%) $14,346Rounded Project Total $87,000Note: The above costs are based on a conceptual layout <strong>of</strong> the stormwater system for this area. Assuch, they are subject to change depending on the final scope <strong>of</strong> the project that is designed andconstructed as well as other factors. Estimate is in 2008 dollars.L:\boca\bocaswmp\A6016.03\rp02accm.docPage 12MOCK•ROOS

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!