19.09.2015 Views

BRIDGE REPAIR/REHABILITATION FEASIBILITY STUDY

Bridge Repair_Rehabilitation Feasibility Study - Town to Chatham

Bridge Repair_Rehabilitation Feasibility Study - Town to Chatham

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

CITY/TOWN B.I.N. BR. DEPT. NO. 8.-STRUCTURE NO. INSPECTION DATE<br />

CHATHAM<br />

437 C-07-001 C07001-437-MUN-NBI<br />

OCT 5, 2010<br />

PHOTOS<br />

PAGE 9 OF 22<br />

Photo 1:<br />

Typical worn wearing surface with protruding knots and nail heads.<br />

Also note the replacement plank not sitting flush with worn planks.<br />

Photo 2:<br />

Failed deck timber between stringers 10 and 11 in span 4.<br />

REM.(2)7-96

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!