19.09.2015 Views

BRIDGE REPAIR/REHABILITATION FEASIBILITY STUDY

Bridge Repair_Rehabilitation Feasibility Study - Town to Chatham

Bridge Repair_Rehabilitation Feasibility Study - Town to Chatham

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Figure 14-8. - Treating holes for fumigants in horizontal members should be placed on<br />

both sides of checks or splits, and be bored to within 1-1/2 to 2 inches of the bottom of the<br />

member.<br />

Figure 14-9. - Application of liquid fumigants. (A) Liquid fumigants applied with<br />

commercial equipment (photo courtesy of Osmose Wood Preserving, Inc.).<br />

14-10

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!