19.09.2015 Views

BRIDGE REPAIR/REHABILITATION FEASIBILITY STUDY

Bridge Repair_Rehabilitation Feasibility Study - Town to Chatham

Bridge Repair_Rehabilitation Feasibility Study - Town to Chatham

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

CALCULATION COVER SHEET<br />

Project Name: Mitchell River Bridge Repair/Rehabilitation Feasibility Study<br />

Project No.: 10160874<br />

Calculation Title: Repair/Rehabilitation Cost Estimates<br />

Total Number of Pages (including cover sheet):<br />

Prepared By: Swapnil Chogle Date: February 11, 2011<br />

Checked By: George Patton Date: February 14, 2011<br />

Description and Purpose:<br />

Prepare Cost Estimate for two (2) alternatives:<br />

1) Minimum Repair Work (to Address Items Requiring Immediate Corrective Action)<br />

2) Rehabilitation (with Functional and Safety Improvements)<br />

Design Basis / References / Assumptions:<br />

Existing Bridge Design Plans Dated Jan 5, 1980.<br />

Bridge Repair/Rehabilitation Feasibility Study<br />

Remarks / Conclusions:<br />

Estimated Construction Costs are as follows:<br />

1) Minimum Repair Work $ 9,363,000<br />

2) Rehabilitation $ 4,781,000<br />

Approved By: George C. Patton, PE<br />

Title:<br />

Project Engineer<br />

Date: February 14, 2010<br />

Distribution: _____________ _____________<br />

_____________ _____________

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!