19.09.2015 Views

BRIDGE REPAIR/REHABILITATION FEASIBILITY STUDY

Bridge Repair_Rehabilitation Feasibility Study - Town to Chatham

Bridge Repair_Rehabilitation Feasibility Study - Town to Chatham

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

URS Corp.<br />

260 Franklin Street<br />

Boston, MA 02110<br />

PROJECT Mitchell River Bridge Rehabilitation Feasibility Study<br />

<strong>BRIDGE</strong> C-07-001 (437)<br />

MADE BY SUC DATE 1/31/2011 JOB NO. 10160874<br />

CHECKED BY GCP DATE 2/14/2011<br />

Alternate: Minimum Repair Scope of Work<br />

W L H/T No. Quantity Units<br />

Deck ft ft ft<br />

Timber Wearing Surface<br />

Spans 1,2,3,4,5,6,9,10,11,12 25.333 15.96 0.250 9 10916.6 FB<br />

Bascule Spans 25.333 50.00 0.250 1 3800.0 FB<br />

Subtotal: 14716.6 FB<br />

Timber Structural Deck<br />

Spans 1, 8 & 12 31.500 16.13 0.333 3 6097.9 FB<br />

Spans 2 & 11 34.500 16.13 0.333 2 4452.4 FB<br />

Spans 3,4,5,6,7,9 &10 37.500 16.13 0.333 7 16938.6 FB<br />

Subtotal: 27488.9 FB<br />

Timber Sidewalk<br />

Included in "Timber Structural Deck"<br />

Timber Curb<br />

8" x 8" Nom 0.66666 193.58 0.66666 2 2064.8 FB<br />

6" x 8" x 12" Nom 0.5 12 0.6666 66 3167.7 FB<br />

Subtotal: 5232.5 FB<br />

3/1/2011 Page 1/6 Minimum Scope

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!