19.09.2015 Views

BRIDGE REPAIR/REHABILITATION FEASIBILITY STUDY

Bridge Repair_Rehabilitation Feasibility Study - Town to Chatham

Bridge Repair_Rehabilitation Feasibility Study - Town to Chatham

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

URS Corp.<br />

260 Franklin Street<br />

Boston, MA 02110<br />

PROJECT Mitchell River Bridge Rehabilitation Feasibility Study<br />

<strong>BRIDGE</strong> C-07-001 (437)<br />

MADE BY SUC DATE 1/31/2011 JOB NO. 10160874<br />

CHECKED BY GCP DATE 2/14/2011<br />

Alternative: Rehabilitation<br />

ESTIMATED QUANTITIES<br />

Timber Bracing - Lateral<br />

Bent No. 1 0.50 160.40 1.00 1 962.4 FB<br />

Bent No. 2 0.50 164.00 1.00 1 984.0 FB<br />

Bent No. 3 0.50 164.00 1.00 1 984.0 FB<br />

Bent No. 4 0.50 164.00 1.00 1 984.0 FB<br />

Bent No. 4A 0.50 14.80 1.00 1 88.8 FB<br />

Bent No. 5 0.50 106.00 1.00 1 636.0 FB<br />

Bent No. 6A 0.50 14.80 1.00 1 88.8 FB<br />

Bent No. 6 0.50 164.00 1.00 1 984.0 FB<br />

Bent No. 7A 0.50 40.50 1.00 1 243.0 FB<br />

Bent No. 8 0.50 0.00 1.00 1 0.0 FB<br />

Bent No. 9 0.50 27.60 1.00 1 165.6 FB<br />

Bent No. 10 0.50 146.00 1.00 1 876.0 FB<br />

Bent No. 11 0.50 165.64 1.00 1 993.8 FB<br />

Subtotal: 7990.4 FB<br />

Timber Bracing - Longitudinal<br />

Bent No. 2 to Bent No. 3 0.50 19.10 1.00 4 458.4 FB<br />

Bent No. 5 to Bent No. 6A 0.50 19.10 1.00 4 458.4 FB<br />

Bent No. 8 to Bent No. 9 0.50 19.10 1.00 4 458.4 FB<br />

Subtotal: 1375.2 FB<br />

Concrete Abutments<br />

East Abut. Backwall 0.50 1.00 0.75 1 0.38 CF<br />

East Abut. Breastwall 0.17 4.50 0.42 1 0.31 CF<br />

Subtotal: 0.69 CF<br />

3/1/2011 Page 4/6 Rehab Replace Piles

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!