19.09.2015 Views

BRIDGE REPAIR/REHABILITATION FEASIBILITY STUDY

Bridge Repair_Rehabilitation Feasibility Study - Town to Chatham

Bridge Repair_Rehabilitation Feasibility Study - Town to Chatham

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

CITY/TOWN B.I.N. BR. DEPT. NO. 8.-STRUCTURE NO. INSPECTION DATE<br />

CHATHAM<br />

437 C-07-001 C07001-437-MUN-NBI<br />

OCT 5, 2010<br />

PHOTOS<br />

PAGE 21 OF 22<br />

Photo 25:<br />

Lack of transition between bridge rail and approach rail at southwest<br />

corner of bridge.<br />

Photo 26:<br />

1 1/2" gap between the southeast approach guardrail posts and the<br />

face of the wingwall.<br />

REM.(2)7-96

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!