19.09.2015 Views

BRIDGE REPAIR/REHABILITATION FEASIBILITY STUDY

Bridge Repair_Rehabilitation Feasibility Study - Town to Chatham

Bridge Repair_Rehabilitation Feasibility Study - Town to Chatham

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

URS Corp.<br />

260 Franklin Street<br />

Boston, MA 02110<br />

PROJECT Mitchell River Bridge Rehabilitation Feasibility Study<br />

<strong>BRIDGE</strong> C-07-001 (437)<br />

MADE BY SUC DATE 1/31/2011 JOB NO. 10160874<br />

CHECKED BY GCP DATE 2/14/2011<br />

Alternate: Minimum Repair Scope of Work<br />

Substructure<br />

Timber Piles (FRP Jackets)<br />

West Abutment 8.00 4.00 32.0 FT<br />

Bent No. 1 8.10 10.00 81.0 FT<br />

Bent No. 2 10.92 10.00 109.2 FT<br />

Bent No. 3 13.82 10.00 138.2 FT<br />

Bent No. 4 16.80 10.00 168.0 FT<br />

Bent No. 4A 17.25 6.00 103.5 FT<br />

Bent No. 5 18.64 7.00 130.5 FT<br />

Bent No. 6A 20.00 8.00 160.0 FT<br />

Bent No. 6 20.00 10.00 200.0 FT<br />

Bent No. 7A 20.00 7.00 140.0 FT<br />

Bent No. 8 20.00 10.00 200.0 FT<br />

Bent No. 9 18.60 16.00 297.6 FT<br />

Bent No. 10 16.50 10.00 165.0 FT<br />

Bent No. 11 12.50 11.00 137.5 FT<br />

East Abutment 8.00 9.00 72.0 FT<br />

Subtotal: 2134.5 FT<br />

3/1/2011 Page 3/6 Minimum Scope

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!