BRIDGE REPAIR/REHABILITATION FEASIBILITY STUDY

Bridge Repair_Rehabilitation Feasibility Study - Town to Chatham

Bridge Repair_Rehabilitation Feasibility Study - Town to Chatham

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

URS Corp.<br />

260 Franklin Street<br />

Boston, MA 02110<br />

PROJECT Mitchell River Bridge Rehabilitation Feasibility Study<br />

<strong>BRIDGE</strong> C-07-001 (437)<br />

MADE BY SUC DATE 1/31/2011 JOB NO. 10160874<br />

CHECKED BY GCP DATE 2/14/2011<br />

Alternative: Rehabilitation<br />

ESTIMATED QUANTITIES<br />

Channel & Channel Protection<br />

Timber Fender System<br />

Fender 0.50 7.60 1.00 66 3009.6 FB<br />

6" x 12" x 41'-0" 0.50 41.00 1.00 4 984.0 FB<br />

Subtotal: 3993.6 FB<br />

Traffic Safety<br />

Approach Guardrail/Transitions<br />

Timber Traffic Rail<br />

Timber Post (10"x8" Nom) 0.667 4.250 0.833 87 2456.9 FB<br />

Timber Block (4.5"x13.5") 0.396 1.167 1.125 87 542.4 FB<br />

Top Rail (6.5"x6.5") 0.542 433.580 0.542 2 3053.1 FB<br />

Bott.Rail (12"x6" Nom) 1.000 433.580 0.500 2 5203.0 FB<br />

Subtotal: 11255.4 FB<br />

Roadway (Milling and Resurfacing) 24 120 2 640.0 SY<br />

Concrete for Sidewalk (refer to hand sketch)<br />

A 4.625 0.5 120 4 41.1 CY<br />

B 1.0 2.0 120 4 35.6 CY<br />

Subtotal: 76.7 CY<br />

Curb & Gutter 120 4 480.0 FT<br />

Demolition<br />

Spans 1, 8 & 12 31.50 16.13 3 1523.8 SF<br />

Spans 2 & 11 34.50 16.13 2 1112.6 SF<br />

Spans 3, 4, 5, 6, 7, 9 & 10 37.50 16.13 7 4232.8 SF<br />

Subtotal: 6869.3 SF<br />