CITY/TOWN B.I.N. BR. DEPT. NO. 8.-STRUCTURE NO. INSPECTION DATE<br />

CHATHAM<br />

437 C-07-001 C07001-437-MUN-NBI<br />

OCT 5, 2010<br />

PHOTOS<br />

PAGE 17 OF 22<br />

Photo 17:<br />

3/4" gap between top of 5th pile from south and pile cap at bent 2.<br />

Photo 18:<br />

Section loss and full depth vertical split at 6th pile from south end of<br />

bent 2.<br />

REM.(2)7-96