19.09.2015 Views

BRIDGE REPAIR/REHABILITATION FEASIBILITY STUDY

Bridge Repair_Rehabilitation Feasibility Study - Town to Chatham

Bridge Repair_Rehabilitation Feasibility Study - Town to Chatham

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

3.0 <strong>BRIDGE</strong> DESCRIPTION<br />

Bridge Number C-07-001 (437) carries Bridge Street over the Mitchell River between Stage<br />

Harbor Road and the intersection of Main Street and Morris Island Road in the Town of<br />

Chatham. Bridge Street is a two-lane local road with two-way traffic and is classified as an<br />

Urban Collector with Average Daily Traffic of 2,100 vehicles of which approximately 6% are<br />

trucks. The bridge is approximately 192 feet long and consists of a twelve span timber trestle<br />

structure including a single-leaf timber bascule type lift span.<br />

There has been a timber drawbridge at this location continually since 1858. However, the bridge<br />

has been replaced, reconstructed and modified numerous times since the first bridge was initially<br />

constructed. The known history of the bridge generally is as follows:<br />

Location: Bridge<br />

No. C-07-001 (437)<br />

Location Map<br />

• The original 1858 bridge included a timber double-leaf bascule span and timber approach<br />

spans that were significantly longer than the present bridge.<br />

Repair/Rehab. Feasibility Study March 10, 2011<br />

Bridge No. C-07-001 (437) 6 Final Report

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!