BRIDGE REPAIR/REHABILITATION FEASIBILITY STUDY

Bridge Repair_Rehabilitation Feasibility Study - Town to Chatham

Bridge Repair_Rehabilitation Feasibility Study - Town to Chatham

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

URS Corp.<br />

260 Franklin Street<br />

Boston, MA 02110<br />

PROJECT Mitchell River Bridge Rehabilitation Feasibility Study<br />

<strong>BRIDGE</strong> C-07-001 (437)<br />

MADE BY SUC DATE 1/31/2011 JOB NO. 10160874<br />

CHECKED BY GCP DATE 2/14/2011<br />

Alternative: Rehabilitation<br />

ESTIMATED QUANTITIES<br />

Superstructure<br />

Stringers 6" x 16" (Including Blocking)<br />

Span 1 0.50 15.96 1.33 26 3319.7 FB<br />

Span 2 0.50 15.96 1.33 27 3447.4 FB<br />

Span 3 0.50 15.96 1.33 29 3702.7 FB<br />

Span 4 0.50 15.96 1.33 30 3830.4 FB<br />

Span 5 0.50 15.96 1.33 29 3702.7 FB<br />

Span 6 0.50 15.96 1.33 30 3830.4 FB<br />

Span 7 (Counter Weight) 0.50 11.45 1.33 31 2839.6 FB<br />

Span 8 (Bascule Span) 0.67 22.00 1.33 25 5869.6 FB<br />

Span 9 0.50 16.55 1.33 30 3972.0 FB<br />

Span 10 0.50 15.96 1.33 29 3702.7 FB<br />

Span 11 0.50 15.96 1.33 27 3447.4 FB<br />

Span 12 0.50 15.96 1.33 26 3319.7 FB<br />

Diaphragm Blocks 0.79 1.00 1.00 327 3106.5 FB<br />

Subtotal: 48090.7 FB<br />

Lifting Beam 0.67 35.50 1.00 1 285.4 FB<br />

King Posts 1.17 29.25 1.17 2 955.4 FB<br />

3/1/2011 Page 2/6 Rehab Replace Piles