19.09.2015 Views

BRIDGE REPAIR/REHABILITATION FEASIBILITY STUDY

Bridge Repair_Rehabilitation Feasibility Study - Town to Chatham

Bridge Repair_Rehabilitation Feasibility Study - Town to Chatham

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

CITY/TOWN B.I.N. BR. DEPT. NO. 8.-STRUCTURE NO. INSPECTION DATE<br />

CHATHAM<br />

437 C-07-001 C07001-437-MUN-NBI<br />

OCT 5, 2010<br />

PHOTOS<br />

PAGE 11 OF 22<br />

Photo 5:<br />

Deteriorated, broken and loose electrical conduits with exposed<br />

wiring along the west side of bent 7A.<br />

Photo 6:<br />

1 1/2" of misalignment of bascule span toe towards the north.<br />

REM.(2)7-96

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!