19.09.2015 Views

BRIDGE REPAIR/REHABILITATION FEASIBILITY STUDY

Bridge Repair_Rehabilitation Feasibility Study - Town to Chatham

Bridge Repair_Rehabilitation Feasibility Study - Town to Chatham

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

URS Corp.<br />

260 Franklin Street<br />

Boston, MA 02110<br />

PROJECT Mitchell River Bridge Rehabilitation Feasibility Study<br />

<strong>BRIDGE</strong> C-07-001 (437)<br />

MADE BY SUC DATE 1/31/2011 JOB NO. 10160874<br />

CHECKED BY GCP DATE 2/14/2011<br />

Alternative: Rehabilitation<br />

ESTIMATED QUANTITIES<br />

COUNTERWEIGHT W L H/T Number Vol<br />

Ballast 31.50 3.50 1.86 1 100600 LB<br />

Subtotal: 100600 LB<br />

Substructure<br />

Timber Pile Replacement 60.00 128.00 7680.0 FT<br />

Timber Pile Caps<br />

West Abutment Cap 0.67 31.08 0.67 1 165.8 FB<br />

Bent No.1 1.33 31.50 1.17 1 588.0 FB<br />

Bent Nos. 2,3,4,4A,5,6A,6,8,9 &10 1.33 37.50 1.17 11 7700.0 FB<br />

Bent Nos. 7A 0.67 41.50 1.33 2 889.8 FB<br />

Bent No. 11 1.33 31.35 1.17 1 585.3 FB<br />

East Abutment Cap 1.00 31.42 0.67 1 251.3 FB<br />

Wood Blocking 1.00 1.50 1.33 138 3312.0 FB<br />

Subtotal: 13492.1 FB<br />

3/1/2011 Page 3/6 Rehab Replace Piles

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!