BRIDGE REPAIR/REHABILITATION FEASIBILITY STUDY
Bridge Repair_Rehabilitation Feasibility Study - Town to Chatham
Bridge Repair_Rehabilitation Feasibility Study - Town to Chatham
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
TABLE OF CONTENTS<br />
TABLE OF CONTENTS............................................................................................................1<br />
1.0 EXECUTIVE SUMMARY .............................................................................................2<br />
2.0 INTRODUCTION ...........................................................................................................5<br />
3.0 <strong>BRIDGE</strong> DESCRIPTION................................................................................................6<br />
4.0 ELEMENT CONDITION & <strong>REHABILITATION</strong>/<strong>REPAIR</strong> SCOPE .......................... 10<br />
4.1 Overall Condition.......................................................................................................10<br />
4.2 Deck ...........................................................................................................................13<br />
4.3 Superstructure............................................................................................................. 22<br />
4.4 Substructure................................................................................................................33<br />
4.5 Channel & Channel Protection...................................................................................44<br />
4.6 Traffic Safety..............................................................................................................46<br />
5.0 OTHER CONSIDERATIONS.......................................................................................48<br />
5.1 Navigation Opening ...................................................................................................48<br />
5.2 Maintenance and Service Life....................................................................................49<br />
5.3 Funding.......................................................................................................................52<br />
6.0 SCOPE, COST AND SERVICE LIFE FOR <strong>REPAIR</strong> & <strong>REHABILITATION</strong> ........... 53<br />
7.0 CONCLUSIONS AND RECOMMENDATIONS ........................................................ 55<br />
APPENDICES ..........................................................................................................................58<br />
A. Existing Bridge Plans<br />
B. Structures Field Inspection Reports<br />
• 2004 Routine<br />
• 2006 Routine<br />
• 2008 Routine<br />
• 2010 Routine<br />
• 2010 Underwater<br />
• 2010 Powder Point Bridge (Duxbury)<br />
C. Load Rating Summary (1997)<br />
D. In-place Preservative Treatments<br />
E. Commercial Timbers of the Caribbean<br />
F. FRP Pile Jackets<br />
G. Cost Estimates<br />
H. Operating Equipment Evaluation<br />
I. Correspondence<br />
Repair/Rehab. Feasibility Study March 10, 2011<br />
Bridge No. C-07-001 (437) 1 Final Report