19.09.2015 Views

BRIDGE REPAIR/REHABILITATION FEASIBILITY STUDY

Bridge Repair_Rehabilitation Feasibility Study - Town to Chatham

Bridge Repair_Rehabilitation Feasibility Study - Town to Chatham

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

TABLE OF CONTENTS<br />

TABLE OF CONTENTS............................................................................................................1<br />

1.0 EXECUTIVE SUMMARY .............................................................................................2<br />

2.0 INTRODUCTION ...........................................................................................................5<br />

3.0 <strong>BRIDGE</strong> DESCRIPTION................................................................................................6<br />

4.0 ELEMENT CONDITION & <strong>REHABILITATION</strong>/<strong>REPAIR</strong> SCOPE .......................... 10<br />

4.1 Overall Condition.......................................................................................................10<br />

4.2 Deck ...........................................................................................................................13<br />

4.3 Superstructure............................................................................................................. 22<br />

4.4 Substructure................................................................................................................33<br />

4.5 Channel & Channel Protection...................................................................................44<br />

4.6 Traffic Safety..............................................................................................................46<br />

5.0 OTHER CONSIDERATIONS.......................................................................................48<br />

5.1 Navigation Opening ...................................................................................................48<br />

5.2 Maintenance and Service Life....................................................................................49<br />

5.3 Funding.......................................................................................................................52<br />

6.0 SCOPE, COST AND SERVICE LIFE FOR <strong>REPAIR</strong> & <strong>REHABILITATION</strong> ........... 53<br />

7.0 CONCLUSIONS AND RECOMMENDATIONS ........................................................ 55<br />

APPENDICES ..........................................................................................................................58<br />

A. Existing Bridge Plans<br />

B. Structures Field Inspection Reports<br />

• 2004 Routine<br />

• 2006 Routine<br />

• 2008 Routine<br />

• 2010 Routine<br />

• 2010 Underwater<br />

• 2010 Powder Point Bridge (Duxbury)<br />

C. Load Rating Summary (1997)<br />

D. In-place Preservative Treatments<br />

E. Commercial Timbers of the Caribbean<br />

F. FRP Pile Jackets<br />

G. Cost Estimates<br />

H. Operating Equipment Evaluation<br />

I. Correspondence<br />

Repair/Rehab. Feasibility Study March 10, 2011<br />

Bridge No. C-07-001 (437) 1 Final Report

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!