Electrical installations 315<br />

9. State the function of power factor correction in alternating current circuits.<br />

10. Calculate the apparent power, in kilovolt-amperes, of an electric motor which is connected<br />

to a 415 V AC three-phase supply and has a current flow of 17.5 A.<br />

11. Calculate the resistance of a3kWimmersion heater on a 240 V AC circuit.<br />

12. What current, in milli-amperes, would flow to earth during an insulation resistance test when<br />

a 500 V DC emf is applied between the line and protective conductors and the resistance is<br />

found to be 1.75 M?<br />

13. Show by sample calculation why smaller cables can be used for long-distance power<br />

transmission when very high voltages are used.<br />

14. A 33 kV supply to a factory carries 250 A per phase or line. Calculate the usable electrical<br />

power in the factory if the average power factor is 0.68.<br />

15. Find the maximum length of 6 mm 2 cable that can be used if the maximum current-carrying<br />

capacity is to be utilized on a 240 V circuit.<br />

16. A building site is to have the following electrical equipment in use each day:<br />

(a) concrete mixer, 5 kW, 4 h, 415 V;<br />

(b) sump pump, 1.5 kW, 6 h, 240 V;<br />

(c) 20 lamps, 150 W each, 4 h, 240 V;<br />

(d) 5 flood lamps, 300 W each, 4 h, 240 V;<br />

(e) 6 hand tools, 750 W each, 5 h, 110 V.<br />

The power factor of the machinery is 0.8. Site work takes place 5 days per week for 28<br />

weeks. Electricity costs 6 p per unit. Find<br />

(i)<br />

(ii)<br />

the total kilovolt-amperes and the line current of the required temporary incoming<br />

supply system, and<br />

the cost of the electricity used on site during the contract.<br />

17. Sketch and describe the safety precautions taken to avoid contact with both overhead and<br />

underground electricity cables during site construction work.<br />

18. Sketch a suitable arrangement of temporary wiring, control and safety equipment on a site<br />

where the following items are employed: tower crane, sump pump, five flood lamps, security<br />

lighting and circuits on each of three floors for hand lamps and tools.<br />

19. List the site programme for the main contractor in the installation and operation of temporary<br />

site electrical services.<br />

20. Sketch and describe the characteristics of rewirable and cartridge fuses and residual current<br />

devices.<br />

21. Show how an underground electrical service cable enters a building. Sketch the arrangement<br />

of electricity distribution within a typical residence.<br />

22. List the cable and conduit systems used for electricity distribution and state their applications.<br />

23. Briefly describe the methods of testing electrical installations.<br />

24. State the requirements of telecommunications installations.<br />

25. Sketch and describe a lightning conductor installation for a city centre office block.<br />

26. Design a lightning conductor system for a 60 m high building on clay shale using 4.5 m<br />

earth rods. The down conductor is to be a copper rod 10 mm in diameter.<br />

27. Why is power factor in electrical systems an issue for concern? More than one correct<br />

answer.<br />

1. It is not of any concern.<br />

2. Low-power factor means electrical energy is used inefficiently.<br />

3. High-power factor means electrical energy is wasted.