320 Electrical installations<br />

51. Which is a typical time interval for a residual current device to open a 60 A circuit-breaker<br />

double-pole switch when a fault current occurs?<br />

1. 6 min.<br />

2. 1 min.<br />

3. 1 s.<br />

4. 20 ms.<br />

5. Less than 0.001 s.<br />

52. What does RCD stand for?<br />

1. Residual circuit device.<br />

2. Residual current device.<br />

3. Resistance circuit design.<br />

4. Radio carbon dating.<br />

5. Ratio circuit device.<br />

53. Which is the most common form of mortality from electric shock?<br />

1. Burns.<br />

2. Ventricular fibrillation.<br />

3. Muscle spasm.<br />

4. Pain.<br />

5. Bleeding.<br />

54. Which is not a normal application for use of MICC wiring?<br />

1. Fire alarms systems.<br />

2. Public buildings such as theatres.<br />

3. Tunnels.<br />

4. Temporary buildings.<br />

5. Power stations and heavy industrial buildings.<br />

55. Why are cables installed within fixed conduit?<br />

1. Hides ugly cables.<br />

2. Conduit is a permanent fixture of the building while cables require replacement when<br />

aged.<br />

3. Conduit becomes earth continuity conductor.<br />

4. Reduce heat emission from cables.<br />

5. Protects PCV cables from heat gain from environment.<br />

56. Which is correct about electrical systems?<br />

1. Watts = volts × amps.<br />

2. Three-phase current = 3 × single-phase current.<br />

3. Watts and volt-amperes are always the same value.<br />

4. Current = voltage × resistance.<br />

5. Current measured in mega-ohms.