03.05.2017 Views

Cost Accounting (14th Edition)

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

costs are allocated to each division to create the seventh division indirect-cost pool.)<br />

CAI identifies the cost hierarchy category for each cost pool: output-unit level,<br />

batch level, product sustaining level, and facility-sustaining level (as described in<br />

Chapter 5, p. 149).<br />

Exhibit 14-4 presents an overview diagram of the allocation of corporate and division<br />

indirect costs to products of the refrigerator division. Note: The clothes dryer division has<br />

its own seven indirect-cost pools used to allocate costs to products. These cost pools and<br />

cost-allocation bases parallel the indirect-cost pools and allocation bases for the refrigerator<br />

division.<br />

Look first at the middle row of the exhibit, where you see “Division Indirect-<strong>Cost</strong><br />

Pools,” and scan the lower half. It is similar to Exhibit 5-3 (p. 150), which illustrates ABC<br />

COST ALLOCATION DECISIONS 507<br />

Exhibit 14-4<br />

Overview Diagram of Allocation of Corporate and Division Indirect <strong>Cost</strong>s to Products of the<br />

Refrigerator Division, CAI<br />

CORPORATE<br />

COSTS<br />

Corporate<br />

Treasury<br />

<strong>Cost</strong>s<br />

Corporate<br />

Human Resource<br />

Management<br />

(CHRM) <strong>Cost</strong>s<br />

Corporate<br />

Administration<br />

(CA) <strong>Cost</strong>s<br />

CORPORATE<br />

COST-ALLOCATION<br />

BASE<br />

<strong>Cost</strong> of New<br />

Assembly<br />

Equipment<br />

Salary<br />

and<br />

Labor <strong>Cost</strong>s<br />

Division<br />

Administration<br />

<strong>Cost</strong>s<br />

CORPORATE<br />

COSTS<br />

ALLOCATED TO<br />

DIVISIONS<br />

Refrigerator<br />

Division<br />

Clothes Dryer<br />

Division<br />

DIVISION<br />

INDIRECT-<br />

COST POOLS<br />

Allocated<br />

Corporate<br />

Treasury<br />

<strong>Cost</strong>s<br />

Design<br />

(including<br />

CHRM costs)<br />

Machine<br />

Setup<br />

(including<br />

CHRM costs)<br />

Manufacturing<br />

Operations<br />

(including<br />

CHRM costs)<br />

Distribution<br />

(including<br />

CHRM costs)<br />

Administration<br />

(including<br />

CHRM and<br />

CA costs)<br />

Facility<br />

<strong>Cost</strong>s<br />

DIVISION<br />

COST-ALLOCATION<br />

BASE<br />

Machine-Hours<br />

on New<br />

Equipment<br />

Parts<br />

Cubic feet<br />

Setup-Hours<br />

Machine-Hours<br />

Cubic<br />

Feet<br />

Revenues<br />

COST OBJECT:<br />

REFRIGERATOR<br />

DIVISION<br />

PRODUCTS<br />

Indirect <strong>Cost</strong>s<br />

Direct <strong>Cost</strong>s<br />

DIRECT<br />

COSTS<br />

Direct<br />

Materials<br />

Direct<br />

Manufacturing<br />

Labor

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!