Another problem in connection with finding/defining the right team can be to find the right<br />
persons who fit in with each other and are able to cooperate. One thing is to find out what<br />
necessary technical qualifications and personal skills are needed. But, when all persons who<br />
fulfil the demands of the project are gathered, will they then be able to work as a high<br />
performance team?<br />
Ordinary persons are individuals of whom some already have learned to work as team<br />
members and others have to learn this before the project can start. Some persons can learn it,<br />
others cannot. We have to find those who can do it and/or those who can learn it. All the team<br />
members have to become aware of the fact that they have to move from individual to high<br />
performance team as it is illustrated in the model below. (Soeholm and Storch, 2005)<br />
Model: From individual to high performance team<br />
Low High<br />
Common target and value<br />
Working discipline with the team<br />
Ability to carry out and develop the working process of the team<br />
Synergy in assignment work<br />
Feeling of reward through own and others good performance<br />
Individual Group Team Effective team High performance team<br />
Looking at the model, the main object is to find the right team, to find people who have the<br />
right technical qualifications and the right personal skills and on the other hand have the<br />
ability to work in high performance teams.<br />
3.2 Field observations<br />
One thing is theory but another is practice. Therefore, some interviews of parties in the<br />
building sector have been made (5 clients/building owners, 5 architects/engineers and 5<br />
contractors) (Faber Ussing). They were a<strong>ske</strong>d how the normal tendering process is, what<br />
characterises a good and a bad building team and what sort of tendering process they want if<br />
it was possible to choose freely.<br />
When looking at these results, it is for the 15 a<strong>ske</strong>d persons/companies shown that they feel<br />
confident doing things as usual. The persons a<strong>ske</strong>d had all more than 10 years experience in<br />
the branch and they had used the previous Tendering Law lots of times. They found it easy to<br />
use costs as a criterion, because it is an accepted way to do the tendering process, but they<br />
also admitted that sometimes the results of the process were not optimal.<br />
When they were a<strong>ske</strong>d what a good building process is, they all found that in a good process<br />
the team members communicate well with each other, they help each other and respect other<br />
members and have confidence in each other. It is a process nearly without conflicts, and if<br />
they occur, they will be solved in a good way to everybody’s satisfaction. A good process<br />