How will the company ensure a good aesthetic quality of the project?<br />

Does the company see advantages in using principles from partnering and lean<br />

construction in connection with developing and realising the heating plant?<br />

Is the company willing to cooperate with some of the other consulting engineers, who<br />

are invited to an interview or does the company it selves resolve the problem better?<br />

After the interviews a meeting took place between the client’s board of director and the<br />

operating staff at the district heating plant. After that the client’s board of directors decided to<br />

assign the job to the local consulting engineer who made the account.<br />

3.1.2 Machine part<br />

The procurement of the machine part followed the EU-directives about utility companies with<br />

negotiation. This first meant a normal prequalification. Call for prequalification was public in<br />

the Official Journal of EU and the selection criteria were that the companies had to be qualified<br />

for the work. Applications were received from three companies. They all had enclosed<br />

references from earlier works. The client considered the three companies qualified for doing the<br />

work.<br />

After the prequalification the three companies were a<strong>ske</strong>d to make an offer with negotiation. For<br />

this offer the client made a description containing work descriptions and particular conditions.<br />

The particular conditions contained four assignment criteria: Overall economy (weighting<br />

50%), operational reliability (weighting 20%), simple maintenance (weighting 20%) and the<br />

contractor’s structure of the supply organisation (weighting 10%).<br />

After negotiations and clarifications of the three offers the winner was found. The result<br />

appeared with a ten pages evaluation made by the consulting engineer. Every criterion had been<br />

examined and the companies had been compared and biased with each other. A summary of the<br />

conclusion was send to all the bidders and the contract negotiation was completed with the<br />

winning company.<br />

3.1.3 Building part<br />

The building part was not offered in a normal way. The client compiled a list of five contractors<br />

which the client in consultation with the client’s board of directors, operating staff and the<br />

chosen consulting engineer found qualified for making the project. The contractors were<br />

mentioned in the order in which the client found them most qualified for the work – number 1<br />

was the contractor which the client considered the best collaborator.<br />

Criteria for coming on the list were:<br />

Known beforehand by one in the selection board.<br />