Finally, a conclusion is presented, about using this case as a role model for a right tendering<br />

process, compared to the claim from the existing EU-directives if the client is a public client and<br />

therefore bound to follow the rules from The European Union. Finally there will be a possible<br />

answer to the question: How can we use selection and assignment criteria in the future?<br />

Transmission<br />

systems<br />

3. Discussions – a look in the real life<br />

Consulting<br />

engineer on<br />

transmissission<br />

systems<br />

3.1 Field observations<br />

Client The District Heating<br />

Plant<br />

Board of director<br />

Contractor<br />

building part<br />

Figure1: Organisation Chart for the District Heating Plant<br />

225<br />

Consulting<br />

engineer on<br />

account about<br />

requests and<br />

requirements<br />

Building consultancy<br />

Contractor<br />

machine part<br />

Various delivery<br />

among others<br />

gardener work<br />

outside lithting<br />

furniture<br />

various connections<br />

This case is an example on using selection and assignment criteria in practice in a way where all<br />

concerned parties are satisfied. The case is taken from an ongoing PhD project (Faber Ussing,<br />

L., 2009). The building project is a little private district heating plant and therefore not as a rule<br />

bound by any rules. The project has been followed from where the client got the idea of a new