23.03.2013 Views

VessRAID Setup - Promise Technology, Inc.

VessRAID Setup - Promise Technology, Inc.

VessRAID Setup - Promise Technology, Inc.

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Managing UPS Units<br />

111<br />

Chapter 4: Management with WebPAM PROe<br />

Uninterruptible Power Supply (UPS) Management includes the following<br />

functions:<br />

• Viewing a List of UPS Units (below)<br />

• Making UPS Settings (page 112)<br />

• Viewing UPS Information (page 113)<br />

Viewing a List of UPS Units<br />

To view a list of UPS units supporting the <strong>VessRAID</strong>:<br />

1. Click the Subsystem icon in Tree View.<br />

2. Click the UPS icon.<br />

3. Click the Information tab in Management View.<br />

Information in the UPS List includes:<br />

• UPS ID – Click the ID number to view the UPS Tab.<br />

• Operational Status – OK means Normal.<br />

On AC means the UPS is connected to a viable external AC power<br />

source.<br />

On Battery means the external AC power source is offline and the UPS<br />

is running on battery power.<br />

• Model Name or Number<br />

• Battery Capacity – Backup capacity expressed as a percentage.<br />

• Loading Ratio – Actual output of UPS as a percentage of the rated<br />

output. See the Note below.<br />

• Remaining Backup Time – Number of minutes the UPS is expected to<br />

power your system in the event of a power failure.<br />

Note<br />

The maximum recommended Loading Ratio varies among models<br />

of UPS units. The general range is 60% to 80%. If the reported<br />

Loading Ratio exceeds the recommended value for your UPS unit:<br />

• Have fewer subsystems or peripherals connected to this UPS<br />

unit.<br />

• Add more UPS units, or use a higher-capacity UPS unit, to<br />

protect your RAID systems.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!