23.03.2013 Views

VessRAID Setup - Promise Technology, Inc.

VessRAID Setup - Promise Technology, Inc.

VessRAID Setup - Promise Technology, Inc.

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>VessRAID</strong> 1000i Series Product Manual<br />

Running PDM<br />

Predictive Data Migration (PDM) migrates data from the suspect physical drive to<br />

a spare disk drive, similar to Rebuilding. But unlike Rebuilding, PDM acts before<br />

the disk drive fails and your Logical Drive goes Critical.<br />

You an also run PDM on a specific disk array, see “Running PDM on a Disk<br />

Array” on page 125.<br />

Also see “Predictive Data Migration (PDM)” on page 272.<br />

To run PDM:<br />

1. In Tree View, click the Subsystem icon.<br />

2. In Management View, click the Background Activities tab and choose Start<br />

Media Patrol from the dropdown menu.<br />

3. In the next screen, choose the Source and Target physical drives.<br />

The suspect physical drive is the source. The replacement physical drive is<br />

the target.<br />

4. Click the Start button.<br />

Viewing Scheduled Activities<br />

To view scheduled activities for this subsystem:<br />

1. Click the Subsystem icon Tree View.<br />

2. Click the Scheduler tab in Management View.<br />

Scheduling an Activity<br />

To set a scheduled activity for this subsystem:<br />

1. Click the Subsystem icon Tree View.<br />

2. From the dropdown menu on the Scheduler tab, choose an item:<br />

• Media Patrol. See “Running Media Patrol” on page 57<br />

• Redundancy Check. See “Running Redundancy Check” on page 130<br />

• Battery Reconditioning. See “Reconditioning a Battery” on page 103<br />

• Spare Drive Check. See “Running Spare Check” on page 136<br />

3. In the Scheduler dialog box, check the Enable This Schedule box.<br />

4. Select a start time (24-hour clock).<br />

5. Select a Recurrence Pattern.<br />

• Daily – Enter the number of days between events.<br />

• Weekly – Enter the number of weeks between events and choose<br />

which days of the week.<br />

58

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!