23.03.2013 Views

VessRAID Setup - Promise Technology, Inc.

VessRAID Setup - Promise Technology, Inc.

VessRAID Setup - Promise Technology, Inc.

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Figure 3. <strong>VessRAID</strong> 1830i rear view<br />

Power Supply<br />

For a description of the LEDs, see pages 24 and 25.<br />

Installing the LCD Panel (Optional)<br />

The LCD panel mounts to the left ear of the <strong>VessRAID</strong> enclosure.<br />

11<br />

Cautions<br />

Chapter 2: <strong>VessRAID</strong> Installation<br />

RAID Controller<br />

• The LCD panel is NOT a hot-swap device. Be sure the<br />

<strong>VessRAID</strong> is powered down before you connect or disconnect<br />

the LCD panel.<br />

• You must install the LCD panel before you mount the<br />

<strong>VessRAID</strong> subsystem in a rack.<br />

1. Align the connector on the left bracket of the <strong>VessRAID</strong> enclosure to the<br />

connector on the back of the LCD panel, as shown in Figure 4.<br />

Figure 4. Align the connectors on the enclosure and the LCD panel<br />

Connector on<br />

the enclosure<br />

Connector on<br />

the LCD panel

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!