29.04.2013 Views

AGENDA - Shire of Roebourne

AGENDA - Shire of Roebourne

AGENDA - Shire of Roebourne

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Ordinary Council Meeting – Agenda 19 October 2009<br />

Maintenance <strong>of</strong> <strong>Shire</strong> Assets<br />

The residential planning <strong>of</strong> Western Australia's urban release areas has been predicated<br />

on the public open space provision standard <strong>of</strong> 10% <strong>of</strong> gross subdivisible area. In hot arid<br />

climates a 10% land area contribution for public open space is considered to be excessive.<br />

Subject to the support <strong>of</strong> the local government, the WAPC may accept a public open space<br />

contribution to a minimum <strong>of</strong> 5% <strong>of</strong> the gross subdivisible area providing:<br />

• The public open space is designed, developed and located for the widest possible<br />

use <strong>of</strong> the community, including meeting, recreation, leisure, entertainment;<br />

• The public open space is developed to a minimum standard including all earthworks,<br />

basic reticulation, grassing <strong>of</strong> key areas, pathways that form part <strong>of</strong> the overall<br />

pedestrian and/or cycle network and maintenance for two summers, in accordance<br />

with a landscape plan approved by the local government;<br />

• Adequate areas are provided elsewhere for drainage and flooding, particularly<br />

overland flow;<br />

• Public open space is readily available in the community that can be used at all hours<br />

<strong>of</strong> the day or night; and<br />

• Does not include any restricted use public open space.<br />

The maintenance <strong>of</strong> Karratha's parks, ovals and drainage corridors, under our extreme<br />

climatic conditions, imposes a significant cost impost on Council. High temperatures and<br />

limited water availability makes landscaping difficult and costly to install and maintain. It is<br />

far more effective to minimise the extent <strong>of</strong> the open space provision and to maximise the<br />

planting and on-going maintenance <strong>of</strong> shade trees and large shrubs within more confined<br />

areas.<br />

There are substantive benefits where expenditure can be allocated over a reduced area,<br />

including an improvement to the overall amenity <strong>of</strong> retained open space.<br />

Addressing Housing and Community Needs<br />

Affordable Accommodation for Non-Mining Employees has been identified as a specific<br />

need by the Karratha 2020 Vision and Community Plan 2009 (K2020). The timely release<br />

<strong>of</strong> further residential lots is a key strategy in improving housing affordability. K2020 also<br />

identifies the demand for a range <strong>of</strong> infant health, childcare, parenting, playgroup and<br />

family facilities and services.<br />

The strategy has identified twenty-three [23] ‗candidate areas‘ within Bulgarra, Pegs Creek,<br />

Millars Well and Nickol comprising 18.23 hectares suitable for the creation <strong>of</strong> new single<br />

and grouped residential lots. A community use site in Delambre Drive, Nickol comprising<br />

1.45 hectares was also identified.<br />

Allowing a conservative 700m² for single residential lots and 350m² for grouped residential<br />

lots the indicative lot yield would be 393 accommodating in the order <strong>of</strong> 1100 people.<br />

Further opportunities to extend existing residential lots will, no doubt, also come to light.<br />

In fill subdivision also has the added benefit to draw upon the existing road network and<br />

proximity to existing utility services, thus further reducing costs than simply expanding upon<br />

the current development front.<br />

Page 84

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!