14.06.2013 Views

manuale per l'installatore - 1/3 tipologie d'installazione - 2/3 software ...

manuale per l'installatore - 1/3 tipologie d'installazione - 2/3 software ...

manuale per l'installatore - 1/3 tipologie d'installazione - 2/3 software ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

5.5 CHANGE-OVER<br />

This screen allows to modify the<br />

parameters for the petrol-gas<br />

change-over. Two sections have<br />

been displayed in red (see picture<br />

5.16):<br />

1.Cold engine<br />

2.Warm engine<br />

The first is necessary to the<br />

gas/petrol change-over calibration<br />

when the vehicle is cold (for example<br />

after a long stop without starting<br />

the engine); the second for the<br />

change-over calibration when the<br />

engine is warm (for example when<br />

you start the engine after a short<br />

stop) The reference tem<strong>per</strong>ature is<br />

the genius one or, in case the vehicle<br />

original sensor is connected<br />

and calibrated, the engine cooling<br />

water one.<br />

In the Cold Engine section you<br />

can introduce the following data:<br />

• Change-over tem<strong>per</strong>ature<br />

higher than: it corresponds to<br />

the tem<strong>per</strong>ature we have to<br />

achieve after the set time to<br />

execute the change-over.<br />

• Change-over Delay: it corresponds<br />

to the waiting time<br />

before verifying the change-over<br />

tem<strong>per</strong>ature.<br />

• Similar paragraphs are included<br />

in the Warm Engine section.<br />

Usually, in the Cold Engine section,<br />

it is better to set a low changeover<br />

tem<strong>per</strong>ature and a medium<br />

long delay while in the Warm<br />

Engine one it is better to set an<br />

higher change-over tem<strong>per</strong>ature<br />

Pic. 5.16 - Setting up – change-over parameters calibration<br />

Fig. 5.16a - Setting up - change-over petrol parameters calibration<br />

and a lower delay.<br />

Besides some parameters modification,<br />

the ADVANCED key <strong>per</strong>mits<br />

to execute the petrol/gas<br />

change-over which normally occurs<br />

if there is no gas in the tank or if the<br />

gas tem<strong>per</strong>ature is too low.<br />

This screen parameters have to<br />

be modified only with BRC technicians<br />

support.<br />

The configurable parameters<br />

(fig. 5.16a) are:<br />

43<br />

• MAP maximum value for the<br />

change-over: it corresponds to<br />

the manifold pressure value<br />

under which it is possible to<br />

change from gas to petrol.<br />

• RPM maximum value for the<br />

change-over: it corresponds to<br />

the rpm value under which it is<br />

possible to change from gas to<br />

petrol.<br />

• Petrol change-over tem<strong>per</strong>ature:<br />

it corresponds to the tem<strong>per</strong>ature<br />

threshold under which<br />

the petrol change-over occurs. it

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!