22.07.2013 Views

Tamil Nadu Urban Infrastructure Financial Services ... - Municipal

Tamil Nadu Urban Infrastructure Financial Services ... - Municipal

Tamil Nadu Urban Infrastructure Financial Services ... - Municipal

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Sl. No Sector Project Cost Status<br />

Rs. Lakh<br />

Distribution Line Replacement 14<br />

Mini Power pump at 15 places 9<br />

Project Planning stage<br />

Project Planning stage<br />

CCP cum BP – Krishnagiri <strong>Municipal</strong>ity vi<br />

6657<br />

2 Sanitation Extension of UGD scheme in<br />

uncovered areas<br />

2434<br />

22km of storm water drain<br />

construction including roads 165<br />

Construction of Public<br />

Conveniences<br />

Public convienences 21<br />

25<br />

2645<br />

3 Transportation Up gradation of non-BT roads tot BT<br />

roads 22<br />

4 SWM<br />

New road formation<br />

Resurfacing of roads after UGD<br />

implementation-22 km 264<br />

Bus shelter up gradation<br />

Street light 29<br />

Land acquisition 5.34 acres<br />

identified<br />

49<br />

3<br />

367<br />

Proposed. DPR being<br />

prepared by TWAD<br />

Proposal to be considered<br />

post UGD completion<br />

Project Planning stage<br />

Additional Outlay Phasing<br />

Proposal to be considered<br />

post UGD completion<br />

Proposal envisaged as per<br />

normative gaps<br />

Proposal envisaged as per<br />

normative gaps<br />

Proposal envisaged as per<br />

normative gaps<br />

Additional Outlay Phasing<br />

534 Proposed<br />

Compost yard development 54 Proposed<br />

Primary collection 16<br />

Secondary collection 28<br />

5 Others Health 80 Proposed<br />

6 UIDSSMT<br />

Total<br />

Technical assistance requirements<br />

631<br />

Schools 40 Proposed<br />

Slaughter House 23 Proposed<br />

Gasifier crematorium 40 Proposed<br />

Parks 20 Proposed<br />

Additional Outlay required for<br />

service level goals<br />

12608<br />

203<br />

2105<br />

Additional Outlay Phasing<br />

Additional Outlay Phasing<br />

Additional Outlay required<br />

for service level goals<br />

A list of project level / sector specific technical assistance requirements needed from CMA/TNUISFL<br />

is given below:<br />

1. Comprehensive GIS for the town with updated information on all urban assets including roads,<br />

water supply, sanitation etc.<br />

2. Digitization of layout records and town planning information

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!