Tamil Nadu Urban Infrastructure Financial Services ... - Municipal
Tamil Nadu Urban Infrastructure Financial Services ... - Municipal
Tamil Nadu Urban Infrastructure Financial Services ... - Municipal
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Sl. No Sector Project Cost Status<br />
Rs. Lakh<br />
Distribution Line Replacement 14<br />
Mini Power pump at 15 places 9<br />
Project Planning stage<br />
Project Planning stage<br />
CCP cum BP – Krishnagiri <strong>Municipal</strong>ity vi<br />
6657<br />
2 Sanitation Extension of UGD scheme in<br />
uncovered areas<br />
2434<br />
22km of storm water drain<br />
construction including roads 165<br />
Construction of Public<br />
Conveniences<br />
Public convienences 21<br />
25<br />
2645<br />
3 Transportation Up gradation of non-BT roads tot BT<br />
roads 22<br />
4 SWM<br />
New road formation<br />
Resurfacing of roads after UGD<br />
implementation-22 km 264<br />
Bus shelter up gradation<br />
Street light 29<br />
Land acquisition 5.34 acres<br />
identified<br />
49<br />
3<br />
367<br />
Proposed. DPR being<br />
prepared by TWAD<br />
Proposal to be considered<br />
post UGD completion<br />
Project Planning stage<br />
Additional Outlay Phasing<br />
Proposal to be considered<br />
post UGD completion<br />
Proposal envisaged as per<br />
normative gaps<br />
Proposal envisaged as per<br />
normative gaps<br />
Proposal envisaged as per<br />
normative gaps<br />
Additional Outlay Phasing<br />
534 Proposed<br />
Compost yard development 54 Proposed<br />
Primary collection 16<br />
Secondary collection 28<br />
5 Others Health 80 Proposed<br />
6 UIDSSMT<br />
Total<br />
Technical assistance requirements<br />
631<br />
Schools 40 Proposed<br />
Slaughter House 23 Proposed<br />
Gasifier crematorium 40 Proposed<br />
Parks 20 Proposed<br />
Additional Outlay required for<br />
service level goals<br />
12608<br />
203<br />
2105<br />
Additional Outlay Phasing<br />
Additional Outlay Phasing<br />
Additional Outlay required<br />
for service level goals<br />
A list of project level / sector specific technical assistance requirements needed from CMA/TNUISFL<br />
is given below:<br />
1. Comprehensive GIS for the town with updated information on all urban assets including roads,<br />
water supply, sanitation etc.<br />
2. Digitization of layout records and town planning information