On the reform agenda, however, at 56% the current collection efficiency requires significant<br />

improvement. Connection efficiency (as measured by connections / assessed properties) also is low at<br />

62% and indicates scope for improvement.<br />

7.5.2 Baseline status and requirements – short term & long term<br />

Exhibit 7.3 provides details of the water supply infrastructure and the requirements and gaps in the<br />

short, medium and long term after taking into account the interventions mentioned above.<br />

Exhibit 7.3 Water Supply - Baseline status and gaps (short term and long term)<br />

INFRASTRUCTURE - Baseline<br />

and Gaps<br />

Unit<br />

Baseline Required Incremental addition<br />

+<br />

Ongoing<br />

2012 2017 2027 2012 2017 2027<br />

Gross Water Supply MLD 4.30 10.37 11.14 12.74 6.07 0.77 1.60<br />

Storage Capacity ML 3.00 5.18 5.57 6.37 2.19 0.39 0.80<br />

Distribution network length km 38.65 36.80 41.40 51.75 - 2.75 10.35<br />

HSCs nos 11,936 13,978 16,094 16,783 2,042 2,116 689<br />

Public fountains nos 515 614 660 755 99 46 95<br />

7.5.3 Interventions – immediate priorities<br />

Ongoing initiatives<br />

a. Treatment plant – Krish-M is implementing a treatment plant of 7.3 MLD capacity. Works<br />

are in progress and the project is expected to be completed shortly<br />

b. Replacement of distribution line – Tenders have been received for works for replacement of<br />

parts of distribution network replacement and the subject has been placed before the council.<br />

Hogenakkal water supply project<br />

The Hogenakkal Water supply project for addressing water supply requirements of Dharmapuri and<br />

Krishnagiri district is expected to address requirements of Krishnagiri town as well. Regarding the<br />

project, the following details are available to us based on reports provided to us by TWAD and<br />

TNUIFSL. While we understand that the project is still under finalization and these numbers are<br />

subject to change, they provide the broad details to base the range of Capital investment requirements:<br />

a. Gross water supply – The project is assumed to provide 128 MLD supply at intermediate<br />

stage and 160 MLD at ultimate stage. For Krishnagiri, the project envisages supply of 7.76<br />

MLD at the ultimate stage. While our computation of overall demand works out to nearly<br />

12.74 MLD by 2027 itself as per our estimates, based on a norm of 135 LPCD, we have not<br />

provided for any additional capital investment for the same.<br />

b. Connections – The project envisages servicing 6786 connections.<br />

CCP cum BP - Krishnagiri <strong>Municipal</strong>ity 50