4.7.4 Issues and gaps<br />

Specific issues and gaps with respect to roads and street lighting are summarized below:<br />

1) Problems of traffic congestion and inadequate parking facilities - Increase in the number<br />

of vehicles and inadequate road networks are the major causes for traffic congestion.<br />

Inadequate traffic management measures and inadequate parking facilities are major problems<br />

of the town. The ongoing and planned transportation infrastructure improvements need to be<br />

implemented on priority.<br />

2) Encroachments along the roads - Presence of informal activities along the road margins<br />

illegal encroachments of pedestrian areas and footpaths are the other causes for traffic<br />

congestion in the town. There is considerable commercial activity on the main centre roads.<br />

Many shops along these roads have encroached the road / footpath which creates congestion<br />

in the centre of the town.<br />

3) Need for planning restoration post water supply and UGD scheme - With the plans to<br />

create water supply and an UGD scheme in the city, the entire road network in the town<br />

would need to be restored. So it may be appropriate to take up any large scale upgradation of<br />

the road network keeping this in consideration.<br />

4) Street lights in uncovered areas – The spacing between the streetlights is 40m which is<br />

more than the norm of 30m. The gap can be reduced by provision of more number of<br />

streetlights and covering the area which are presently uncovered.<br />

4.8 <strong>Urban</strong> <strong>Services</strong> for poor<br />

4.8.1 Slum Details<br />

There are 26503 people residing in total of 4479 houses in 21 slums in the town. Slums are improved<br />

under various central / state government slum upgradation programs; still there is scope for further<br />

upgradation. It is proposed to provide additional amenities and infrastructure in some of the slums<br />

though IHSDP program in year 2008.<br />

As there is insufficient provision of physical amenities like water supply, storm water drains,<br />

community baths, sewers, community latrines, street lights leading to health hazards. There is also<br />

lack of community based facilities like primary education, primary health, and recreational activities.<br />

With the overall population of Krishnagiri estimated at 70122 in 2006, the slum population is<br />

estimated to have gone up to nearly 45% of the population in Krishnagiri. Provision of urban services<br />

for the poor and slum rehabilitation should be a critical component of Krish-M‟s plans.<br />

CCP cum BP - Krishnagiri <strong>Municipal</strong>ity 24

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!