Tamil Nadu Urban Infrastructure Financial Services ... - Municipal
Tamil Nadu Urban Infrastructure Financial Services ... - Municipal
Tamil Nadu Urban Infrastructure Financial Services ... - Municipal
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
4. Rapid urban assessment - services, issues and gaps<br />
This section provides details of the current status of various urban services in Krishnagiri<br />
<strong>Municipal</strong>ity and summarizes key issues. The section also covers an analysis of the projects identified<br />
by Krishnagiri municipality as part of its Vision Plan and the demand assessment of these projects.<br />
Finally, the section summarizes the normative gaps in infrastructure provisioning in water supply,<br />
underground drainage, roads, streetlights and solid waste management.<br />
4.1 Water Supply – existing status<br />
4.1.1 Current requirement<br />
Krish-M‟s requirement in 2006 is estimated at about 8.71MLD (Town‟s population of 64,587 @ 135<br />
lpcd).<br />
4.1.2 Sources of supply and Transmission<br />
Water is supplied to the town through two schemes (1) Old scheme (1975) and (2) New scheme. The<br />
head works is situated on the right bank of the river, pumped to reservoir and then distributed to the<br />
town through 38.65 km of Thenpennaiyar in the village called Sundeykuppam at a distance of 11 km.<br />
The water from river is collected in five wells distribution system.<br />
The river Thenpennaiyar is polluted by the sewerage effluents overflowing form the lake Varathur and<br />
Belandur near Bangalore city About 30 % of the drinking water ( Greenish colour) source in the two<br />
districts had fluoride content, 26 % nitrate, 24 % iron and 18 % hardness which could lead to dental,<br />
skeletal flourosis, blue body syndrome, throat infection and skin irritation in that order.<br />
Presently there is no treatment of the water supplied to the city. In order to improve the quality<br />
of water drawn from the river, a treatment plant is being proposed at estimated cost of Rs. 151.73 lakh<br />
by the TWAD board..<br />
Exhibit 4.1 provides details of the sources of water and the total daily supply.<br />
4.1.3 Storage<br />
Exhibit 4.1 Water Supply - Storage infrastructure<br />
Sr. No. Details of water supply schemes Unit Capacity<br />
1 Quantity Supplied MLD 4.3<br />
2 Distance of the Source from Town Km 11<br />
3 Capacity of the Treatment Plant MLD Nil<br />
4 Per capita supply- 2006 Lpcd 61.3<br />
Water is pumped through headworks located at Sundeykuppam (11 Km) and transmitted to the Over<br />
Head Tanks (OHTs) / Ground Level Service Reservoirs (GLSRs), located at various places in the<br />
CCP cum BP - Krishnagiri <strong>Municipal</strong>ity 13