22.07.2013 Views

Tamil Nadu Urban Infrastructure Financial Services ... - Municipal

Tamil Nadu Urban Infrastructure Financial Services ... - Municipal

Tamil Nadu Urban Infrastructure Financial Services ... - Municipal

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

4. Rapid urban assessment - services, issues and gaps<br />

This section provides details of the current status of various urban services in Krishnagiri<br />

<strong>Municipal</strong>ity and summarizes key issues. The section also covers an analysis of the projects identified<br />

by Krishnagiri municipality as part of its Vision Plan and the demand assessment of these projects.<br />

Finally, the section summarizes the normative gaps in infrastructure provisioning in water supply,<br />

underground drainage, roads, streetlights and solid waste management.<br />

4.1 Water Supply – existing status<br />

4.1.1 Current requirement<br />

Krish-M‟s requirement in 2006 is estimated at about 8.71MLD (Town‟s population of 64,587 @ 135<br />

lpcd).<br />

4.1.2 Sources of supply and Transmission<br />

Water is supplied to the town through two schemes (1) Old scheme (1975) and (2) New scheme. The<br />

head works is situated on the right bank of the river, pumped to reservoir and then distributed to the<br />

town through 38.65 km of Thenpennaiyar in the village called Sundeykuppam at a distance of 11 km.<br />

The water from river is collected in five wells distribution system.<br />

The river Thenpennaiyar is polluted by the sewerage effluents overflowing form the lake Varathur and<br />

Belandur near Bangalore city About 30 % of the drinking water ( Greenish colour) source in the two<br />

districts had fluoride content, 26 % nitrate, 24 % iron and 18 % hardness which could lead to dental,<br />

skeletal flourosis, blue body syndrome, throat infection and skin irritation in that order.<br />

Presently there is no treatment of the water supplied to the city. In order to improve the quality<br />

of water drawn from the river, a treatment plant is being proposed at estimated cost of Rs. 151.73 lakh<br />

by the TWAD board..<br />

Exhibit 4.1 provides details of the sources of water and the total daily supply.<br />

4.1.3 Storage<br />

Exhibit 4.1 Water Supply - Storage infrastructure<br />

Sr. No. Details of water supply schemes Unit Capacity<br />

1 Quantity Supplied MLD 4.3<br />

2 Distance of the Source from Town Km 11<br />

3 Capacity of the Treatment Plant MLD Nil<br />

4 Per capita supply- 2006 Lpcd 61.3<br />

Water is pumped through headworks located at Sundeykuppam (11 Km) and transmitted to the Over<br />

Head Tanks (OHTs) / Ground Level Service Reservoirs (GLSRs), located at various places in the<br />

CCP cum BP - Krishnagiri <strong>Municipal</strong>ity 13

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!