22.07.2013 Views

Tamil Nadu Urban Infrastructure Financial Services ... - Municipal

Tamil Nadu Urban Infrastructure Financial Services ... - Municipal

Tamil Nadu Urban Infrastructure Financial Services ... - Municipal

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Exhibits 7.20 and 7.23 summarize reform targets and asset management plan for Krish-M<br />

respectively.<br />

Exhibit 7.20 Service level and reform targets – A summary<br />

FACTOR Unit<br />

WATER SUPPLY<br />

Baseline Target<br />

2007 2012 2017 2027<br />

Service Goals<br />

Per capita supply at doorstep LPCD 60 135 135 135<br />

Storage capacity / Total demand % 47% 50% 50% 50%<br />

Distribution network / Road length % 68% 80% 80% 100%<br />

Frequency of supply hours/day 2 4 8 24X7<br />

Reform targets<br />

Current collection efficiency % 56% 75% 90% 90%<br />

House Service Connections / Assessed Properties % 62% 70% 75% 80%<br />

Population per water fountain nos. 73 125 125 125<br />

Implementation of graded / metered tariff Yes / No No Yes Yes Yes<br />

User charge collection - % of O&M plus debt servicing % n.a 30% 50% 100%<br />

SANITATION<br />

Service Goals<br />

UGD Network<br />

Availability Yes/no No Yes Yes Yes<br />

Design treatment capacity per capita lpcd - 120 120 120<br />

Sewer network - % of road length % - 80% 80% 80%<br />

Storm Water Drains<br />

Drain length / Road length % 67% 80% 100% 100%<br />

Public Conveniences<br />

Slum population per PC seat Nos. 725 200 200 200<br />

Reform targets<br />

Sanitation coverage - % of population % 65% 100% 100% 100%<br />

User charges - Current collection efficiency % NA 70% 90% 90%<br />

Household connections / Assessed Properties % NA 50% 80% 100%<br />

SOLID WASTE MANAGEMENT<br />

Collection efficiency % 100% 90% 90% 100%<br />

Door-to-door collection % 100% 100% 100%<br />

Source Segregation % 30% 60% 80% 100%<br />

Mode of disposal % 0 50% 100% 100%<br />

Conservancy fee Yes / no No yes yes yes<br />

TRANSPORTATION AND STREET LIGHTS<br />

<strong>Municipal</strong> roads as % of Total Area % 8% 8% 9% 9%<br />

Surfaced roads to Total roads % 100% 100% 100% 100%<br />

Street Lights - Distance between streetlights M 25 30 30 30<br />

Street Lights - Proportion of high power lamps % 23% 30% 30% 30%<br />

Street Lights - Proportion of lights with energy savers % 8% 8% 9% 9%<br />

7.12 Asset Management Plan<br />

CCP cum BP - Krishnagiri <strong>Municipal</strong>ity 63

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!