ONGOING / PLANNED INTERVENTIONS -<br />

Status and Outlay<br />

Exhibit 7.7 Sanitation – Ongoing/proposed projects<br />

Rs.in Lakh<br />

Outlay 2008 2009 2010 2011 2012<br />

UGD Scheme 2434 811.3 811.3 811.3<br />

Storm water drains - 22 Kms- UIDSSMT 165 - - 82.5 82.5<br />

Construction of Public conveniences 25 25 - -<br />

TOTAL 2624 25.0 811.3 893.8 893.83 0<br />

The project priorities in the short term are listed below:<br />

A. UGD scheme<br />

Krishnagiri municipality has proposed to provide the sewerage system in entire town and<br />

a plan was prepared by TWAD board at an estimated cost of Rs 22.34 crore. This<br />

includes provision of sewer network length of 45 km along with the STP of 9.0 MLD<br />

capacity tot cater the 12000 house connections in all the 33 wards of the town.<br />

B. Storm water drains<br />

Storm water drains of about 22 km are envisaged to be implemented under the UIDSSMT<br />

scheme post completion of UGD scheme.<br />

C. Public conveniences<br />

Krish-M intends to build about 50 public convenience seats at an outlay of Rs. 25 lakh.<br />

We have provided for construction of another 42 seats at an outlay of Rs. 21 lakh based<br />

on normative gaps.<br />

7.6.4 Interventions – Long term<br />

The proposed investments in UGD will take care of bulk of the sanitation requirements in the medium<br />

to long term as well. However, additional investments will required to take care of growing<br />

population and increase in road length due to new formations / layouts in extension of sewer length.<br />

The proposed UGD system will cover all the wards of Krish-M in terms of sanitation facilities and<br />

also the IHSDP proposal will take care of sanitation facilities in slums. This will reduce the required<br />

number of Public Conveniences up to 2012 by half. We have provided for investments in these areas<br />

on a normative basis, depending on the demand gaps emerging from Exhibit 2.6 above.<br />

7.6.5 Project components and Capital Investment<br />

Exhibit 7.8 provides a summary of the project components, capital outlay and phasing for sanitation.<br />

CCP cum BP - Krishnagiri <strong>Municipal</strong>ity 53