ONGOING / PLANNED INTERVENTIONS -<br />
Status and Outlay<br />
Exhibit 7.7 Sanitation – Ongoing/proposed projects<br />
Rs.in Lakh<br />
Outlay 2008 2009 2010 2011 2012<br />
UGD Scheme 2434 811.3 811.3 811.3<br />
Storm water drains - 22 Kms- UIDSSMT 165 - - 82.5 82.5<br />
Construction of Public conveniences 25 25 - -<br />
TOTAL 2624 25.0 811.3 893.8 893.83 0<br />
The project priorities in the short term are listed below:<br />
A. UGD scheme<br />
Krishnagiri municipality has proposed to provide the sewerage system in entire town and<br />
a plan was prepared by TWAD board at an estimated cost of Rs 22.34 crore. This<br />
includes provision of sewer network length of 45 km along with the STP of 9.0 MLD<br />
capacity tot cater the 12000 house connections in all the 33 wards of the town.<br />
B. Storm water drains<br />
Storm water drains of about 22 km are envisaged to be implemented under the UIDSSMT<br />
scheme post completion of UGD scheme.<br />
C. Public conveniences<br />
Krish-M intends to build about 50 public convenience seats at an outlay of Rs. 25 lakh.<br />
We have provided for construction of another 42 seats at an outlay of Rs. 21 lakh based<br />
on normative gaps.<br />
7.6.4 Interventions – Long term<br />
The proposed investments in UGD will take care of bulk of the sanitation requirements in the medium<br />
to long term as well. However, additional investments will required to take care of growing<br />
population and increase in road length due to new formations / layouts in extension of sewer length.<br />
The proposed UGD system will cover all the wards of Krish-M in terms of sanitation facilities and<br />
also the IHSDP proposal will take care of sanitation facilities in slums. This will reduce the required<br />
number of Public Conveniences up to 2012 by half. We have provided for investments in these areas<br />
on a normative basis, depending on the demand gaps emerging from Exhibit 2.6 above.<br />
7.6.5 Project components and Capital Investment<br />
Exhibit 7.8 provides a summary of the project components, capital outlay and phasing for sanitation.<br />
CCP cum BP - Krishnagiri <strong>Municipal</strong>ity 53