c. Allocated cost –Assuming cost of the project at Rs. 1334 crore, the apportioned cost on a<br />

pro-rata basis works out to Rs. 6470 lakh. Discussion with TWAD authorities indicate that the<br />

project would cover necessary additions to local infrastructure (including distribution network<br />

for uncovered areas and storage augmentation). However, any rehabilitation of existing<br />

distribution network is not being envisaged as part of this project.<br />

7.5.4 Interventions - medium-long term<br />

The Hogennakal water supply scheme would largely take care of the water supply requirements of<br />

Krish-M in the medium to long term as well. We have provided for additional investments for<br />

distribution network extension on the basis of normative gaps. Further, we believe that Krish-M<br />

should strive towards 24x7 water supply in the medium to long term. This would require<br />

comprehensive metering of all connections and implementing volume based user charges.<br />

Investments in metering have been provided based on expected connections in 2027 during 2018-27<br />

Asset Management and Developmental activities<br />

7.5.5 Investment summary - Water supply<br />

The total outlay and phasing of investments for water supply is given in Exhibit 7.4 below.<br />

Exhibit 7.4 Water Supply - Capital Investment outlay and phasing<br />

CAPEX PLAN AND PHASING 2008 2009 2010 2011 2012<br />

ONGOING / PROPOSED PROJECTS<br />

2008-<br />

12<br />

Rs.in Lakhs<br />

Hogenakkal Project-7.76 MLD - 1,617 1,617 1,617 1,617 6,470 - - 6,470<br />

Water Treatment Plant of 7.3 MLD 165 - - - - 165 - - 165<br />

Distribution line replacement 14 - - - - 14 - - 14<br />

Mini Power Pump at 15 places 9 - - - - 9 - - 9<br />

Others - normative estimates<br />

-<br />

Distribution line addition - - - - - - 14 52 66<br />

Metering - - - - - - - 252 252<br />

TOTAL CAPEX - Water supply 187 1,617 1,617 1,617 1,617 6,657 14 303 6,974<br />

7.6 Sanitation<br />

7.6.1 Service Goals and Reform targets<br />

Exhibit 7.5 provides the service goal/outcomes and reform targets for 2008-12.<br />

2013-<br />

17<br />

CCP cum BP - Krishnagiri <strong>Municipal</strong>ity 51<br />