Almost the entire road network is surfaced. However, there is a need for substantial investment in the<br />
road network even in the short term given the proposed underground sewerage projects in the town.<br />
7.8.3 Interventions required – immediate term<br />
Investment / Project components<br />
The key investment components in roads and transportation in Krish-M are listed below:<br />
a) Road upgradation, surfacing and restoration – Krish-M has nearly 44 km of roads and almost<br />
100% roads are surfaced roads. About 22 km of roads would need to be restored after completion<br />
of the UGD phase –I and remaining to be upgraded in the next phase. Outlay for resurfacing is<br />
estimated at Rs. 261 lakh and upgradation would cost Rs. 22 lakh.<br />
b) Road facilities – The gaps in Krish-M with respect to specific road facilities are highlighted in<br />
Exhibit 2.12 above and need to be addressed to meet the service level targets outlined in exhibit<br />
7.11.<br />
c) Bus stand – It is envisaged that the town will require bus stand in the near future, which is<br />
assumed to come up in 2018-27 at an estimated cost of Rs. 600 lakh.<br />
7.8.4 Capital outlay and phasing<br />
Exhibit 7.14 provides the details of the capital outlay for transportation and street lighting<br />
requirements<br />
Exhibit 7.14 Transportation and Street lighting - Capital Investment outlay and phasing<br />
Transportation<br />
Phasing<br />
upto 2012 2013-17 2018-27<br />
<strong>Municipal</strong> road network<br />
Upgrading non-surfaced roads to BT 22 - -<br />
Re-surfacing of roads after UGD implementation 264 - -<br />
New road formation / Surfacing 49 164 164<br />
Re-laying of roads once between 2018-27 - - 697<br />
Bus shelters upgradation 3<br />
TOTAL- Outlay- Service level Gaps 338 164 861<br />
Street lights<br />
upto<br />
2012<br />
2013-17 2018-27<br />
High power lamps 6 7 -<br />
Tube lights - - -<br />
Lights with Energy savers 23 26 26<br />
Total- Outlay Streetlight 29 33 26<br />
Rs in. lakh<br />
Rupees in lakhs<br />
CAPEX PLAN AND PHASING 2010 2011 2012 2008- 2013-17 2018-27 Total<br />
CCP cum BP - Krishnagiri <strong>Municipal</strong>ity 57