Almost the entire road network is surfaced. However, there is a need for substantial investment in the<br />

road network even in the short term given the proposed underground sewerage projects in the town.<br />

7.8.3 Interventions required – immediate term<br />

Investment / Project components<br />

The key investment components in roads and transportation in Krish-M are listed below:<br />

a) Road upgradation, surfacing and restoration – Krish-M has nearly 44 km of roads and almost<br />

100% roads are surfaced roads. About 22 km of roads would need to be restored after completion<br />

of the UGD phase –I and remaining to be upgraded in the next phase. Outlay for resurfacing is<br />

estimated at Rs. 261 lakh and upgradation would cost Rs. 22 lakh.<br />

b) Road facilities – The gaps in Krish-M with respect to specific road facilities are highlighted in<br />

Exhibit 2.12 above and need to be addressed to meet the service level targets outlined in exhibit<br />

7.11.<br />

c) Bus stand – It is envisaged that the town will require bus stand in the near future, which is<br />

assumed to come up in 2018-27 at an estimated cost of Rs. 600 lakh.<br />

7.8.4 Capital outlay and phasing<br />

Exhibit 7.14 provides the details of the capital outlay for transportation and street lighting<br />

requirements<br />

Exhibit 7.14 Transportation and Street lighting - Capital Investment outlay and phasing<br />

Transportation<br />

Phasing<br />

upto 2012 2013-17 2018-27<br />

<strong>Municipal</strong> road network<br />

Upgrading non-surfaced roads to BT 22 - -<br />

Re-surfacing of roads after UGD implementation 264 - -<br />

New road formation / Surfacing 49 164 164<br />

Re-laying of roads once between 2018-27 - - 697<br />

Bus shelters upgradation 3<br />

TOTAL- Outlay- Service level Gaps 338 164 861<br />

Street lights<br />

upto<br />

2012<br />

2013-17 2018-27<br />

High power lamps 6 7 -<br />

Tube lights - - -<br />

Lights with Energy savers 23 26 26<br />

Total- Outlay Streetlight 29 33 26<br />

Rs in. lakh<br />

Rupees in lakhs<br />

CAPEX PLAN AND PHASING 2010 2011 2012 2008- 2013-17 2018-27 Total<br />

CCP cum BP - Krishnagiri <strong>Municipal</strong>ity 57