Tamil Nadu Urban Infrastructure Financial Services ... - Municipal
Tamil Nadu Urban Infrastructure Financial Services ... - Municipal
Tamil Nadu Urban Infrastructure Financial Services ... - Municipal
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
term (covering a period of 5 years starting 2007-08 up to 2011-12) and long term (covering a period<br />
of 15 years starting 2012-13 up to 2026-27). The geographical coverage of the plan includes the area<br />
under the jurisdiction of Krishnagiri municipality as of March 2007.<br />
7.4 Population projections underlying the strategic plan<br />
Exhibit 7.1 provides the population projections that form the basis of arriving at the sector wise<br />
service delivery gaps, interventions required and capital investment estimates.<br />
Exhibit 7.1 Population projections and related estimates - Krishnagiri town<br />
Unit<br />
Baseline Projected<br />
2007 2012 2017 2027<br />
Population Nos 71229 76804 82536 94405<br />
Households (Estd.) Nos 14839 17,068 18,341 20,979<br />
Assessed Properties Nos 19375 19,969 21,459 24,545<br />
Road length Km 44 46 52 52<br />
The population projections have been arrived at as an average of the population projected based on<br />
Arithmetical Increase Method, Geometric Increase Method and Incremental Increase Method. A<br />
household size of 4.9 is assumed (in line with Census 2001).<br />
7.5 Water Supply<br />
7.5.1 Service Goals and Reform targets<br />
Exhibit 7.2 provides the service goal/outcomes and reform targets for 2008-12.<br />
Exhibit 7.2 Water supply - Service Goals and Reform Targets<br />
FACTOR<br />
CCP cum BP - Krishnagiri <strong>Municipal</strong>ity 49<br />
Unit<br />
Baseline Target<br />
2007 2012 2017 2027<br />
Service Goals<br />
Per capita supply at doorstep LPCD 60 135 135 135<br />
Storage capacity / Total demand % 47% 50% 50% 50%<br />
Distribution network / Road length % 68% 80% 80% 100%<br />
Frequency of supply hours/day 2 4 8 24X7<br />
Reform targets<br />
Current collection efficiency % 56% 75% 90% 90%<br />
House Service Connections / Assessed Properties % 62% 70% 75% 80%<br />
Population per water fountain nos. 73 125 125 125<br />
Implementation of graded / metered tariff Yes / No No Yes Yes Yes<br />
User charge collection - % of O&M plus debt servicing % n.a 30% 50% 100%<br />
As against the standards of 90 LPCD of water supply, Krishnagiri municipality is able to supply only<br />
60 LPCD. However, as per WHO norm, provision of 135 lpcd supply should be the target of Krish-M<br />
with intentions to implement a comprehensive water supply project by 2017.