Tamil Nadu Urban Infrastructure Financial Services ... - Municipal
Tamil Nadu Urban Infrastructure Financial Services ... - Municipal
Tamil Nadu Urban Infrastructure Financial Services ... - Municipal
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
4.3 Proposed Hogenakkal Water Supply Project<br />
The water supply requirement of the Dharmapuri and Krishnagiri districts is expected to be addressed<br />
the proposed Hogenakkal project. The beneficiaries of this project will be Dharmapuri, Krishnagiri<br />
and Hosur municipality, Seventeen town Panchayats from Dharmapuri district and six thoursand and<br />
fiifty five villages. The estimated installation cost of the project is Rs. 1334 crore and the estimated<br />
maintenance cost is Rs. 51.65 crore. The project is funded by JBIC and implementing agency will be<br />
TWAD board.<br />
. Exhibit 4.4 provides a summary of the proposed Hogenakkal water supply scheme.<br />
Exhibit 4.4 Beneficiary list and Distribution length proposed in Hogenakkal project<br />
Beneficiary List<br />
District <strong>Municipal</strong>ities<br />
Town<br />
Panchayats<br />
nos.<br />
1. Dharmapuri a) Dharmapuri 10 8<br />
Unions<br />
Population coverage 2001 64444 128473 1103348<br />
Population for Base year 2006 73000 134898 1158516<br />
Population forecast for 2036 138000 175370 1506072<br />
2. Krishnagiri<br />
b) Krishangiri town<br />
c) Hosur town<br />
Population coverage 2001 149338 89163 129246<br />
Population for Base year 2006 163000 93622 1357084<br />
Population forecast for 2036 336000 121708 1764209<br />
Source: As provided by Hogenakkal project office, TWAD board<br />
The water from the surface flow of river Cauvery at the Hogenakkal 1276 lakh litres of water would<br />
be pumped to a height of 913 metres to Head works is located at 6.22 km from source. From treatment<br />
plant it will travel a distance of 5.3 km to reach Pennagaram and Madam; from here gravity would<br />
carry the water to most of the habitations to 3 municipalities (Krishnagiri, Dharmapuri, and Hosur),<br />
17 town panchayats and 6,755 villages in 18 blocks.<br />
Exhibit 4.5 gives other details of the proposed scheme.<br />
Exhibit 4.5 Other details of proposed Hogenakkal water supply project<br />
SN Particulars Details<br />
1<br />
Proposed Per capita raw<br />
water supply<br />
2 Headwork<br />
CCP cum BP - Krishnagiri <strong>Municipal</strong>ity 15<br />
7<br />
90 lpcd for 70% of pop (HIG)<br />
40 lpcd for 70% of pop (LIG)<br />
Intake well in river Cauvery at<br />
Hogenakkal<br />
3 Pumping 18 hrs- 1,18,148 LPM<br />
4 Raw water main 1000mm dia and 6.2 Km length<br />
5<br />
Treatment plant at 6.21 Km<br />
from Head works<br />
127.6 MLD<br />
Source: As provided by Hogenakkal project office, TWAD board<br />
10