<strong>The</strong>re is a risk of reduced availability of hunted species, because they can be<br />

displaced from traditional hunting grounds.<br />

In general, the best way of mitigating impacts from development and production<br />

activities is to combine a detailed background study of the environment<br />

(in order to locate sensitive ecosystem components) with careful planning<br />

of structure placement and transport corridors. <strong>The</strong>n BEP, BAT and<br />

applying international standards such as OSPAR and HOCNF can do much<br />

to reduce emissions to air and sea. A discharge policy, as planned <strong>for</strong> the<br />

Barents Sea, can contribute substantially to minimising impacts. Furthermore,<br />

monitoring of effects on the sites is essential.<br />

10.4 Decommissioning<br />

Impacts from decommissioning activities are mainly from noise at the sites<br />

and from traffic, assuming that all materials and waste are taken out of the<br />

assessment area and deposited at a safe site. <strong>The</strong>re will also be a risk of pollution<br />

from accidental releases. However, decommissioning activities are<br />

short term and careful planning and adoption of BAT, BEP and international<br />

standards would minimise impacts.<br />

An important issue to address in the planning phase is to design installations<br />

<strong>for</strong> easy removal when activities are terminated.<br />