User's Manual AXF Magnetic Flowmeter Integral ... - Yokogawa
User's Manual AXF Magnetic Flowmeter Integral ... - Yokogawa
User's Manual AXF Magnetic Flowmeter Integral ... - Yokogawa
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
5. MAINTENANCE<br />
Coil Circuit<br />
Checking is possible even if the pipe is filled with<br />
fluid.<br />
Test Terminals Test Voltage Specification<br />
Between terminals<br />
EX1 and C<br />
500 V DC (Use an insulation<br />
tester or the equivalent.)<br />
1 M or more<br />
T050601.EPS<br />
Signal Circuit<br />
Before testing, be sure to empty and dry the interior of<br />
the pipe, checking that there is no adhesive material.<br />
Also undo the wiring connection on the converter side<br />
before testing.<br />
Test Terminals Test Voltage Specification<br />
Between terminals<br />
A and C<br />
Between terminals<br />
B and C<br />
500 V DC (Use an insulation<br />
tester or the equivalent.)<br />
100 M or<br />
more for each<br />
T050602.EPS<br />
5-11<br />
IM 01E20D01-01E