21.04.2014 Views

User's Manual AXF Magnetic Flowmeter Integral ... - Yokogawa

User's Manual AXF Magnetic Flowmeter Integral ... - Yokogawa

User's Manual AXF Magnetic Flowmeter Integral ... - Yokogawa

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

5. MAINTENANCE<br />

Coil Circuit<br />

Checking is possible even if the pipe is filled with<br />

fluid.<br />

Test Terminals Test Voltage Specification<br />

Between terminals<br />

EX1 and C<br />

500 V DC (Use an insulation<br />

tester or the equivalent.)<br />

1 M or more<br />

T050601.EPS<br />

Signal Circuit<br />

Before testing, be sure to empty and dry the interior of<br />

the pipe, checking that there is no adhesive material.<br />

Also undo the wiring connection on the converter side<br />

before testing.<br />

Test Terminals Test Voltage Specification<br />

Between terminals<br />

A and C<br />

Between terminals<br />

B and C<br />

500 V DC (Use an insulation<br />

tester or the equivalent.)<br />

100 M or<br />

more for each<br />

T050602.EPS<br />

5-11<br />

IM 01E20D01-01E

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!