<strong>Synchronous</strong> <strong>Generators</strong> <strong>BG</strong> <strong>132</strong> / <strong>BG</strong> <strong>160</strong><br />

Chapter 5, Operation<br />

5.6.3 Checking the insulation monitoring unit (if available)<br />

CAUTION<br />

If your generator is equipped with the option "Insulation<br />

monitoring with switching-off", the correct function of the<br />

insulation monitoring unit has to be checked every working day.<br />

The generator may only be taken into operation, if the correct<br />

function of the insulation monitoring unit has been confirmed.<br />

Proceed as follows to check the insulation monitoring unit (refer to Figure 27 for<br />

the location of the control elements <strong>and</strong> indicators):<br />

1. Unplug all devices <strong>and</strong> cables connected to the generator.<br />

2. Start the engine. The check must be performed while the generator is<br />

running.<br />

3. Open the cover of the control box <strong>and</strong> switch on the insulation monitoring<br />

unit (position "ON" or "I").<br />

4. Push the red test push-button which is at the same time used as an indicator.<br />

Now the insulation monitoring unit must trip.<br />

5. Check whether the insulation monitoring unit has tripped <strong>and</strong> the red<br />

indicator "FAULTY INSULATION" is on.<br />

NOTE<br />

If the insulation monitoring unit does not trip or if the "FAULTY<br />

INSULATION" indicator does not light, the generator must not<br />

be used any longer. In this case, mark the generator as<br />

defective <strong>and</strong> have it repaired (refer to section 7 on page 92).<br />

6. Stop the engine to reset the insulation monitoring unit.<br />

7. Switch on the insulation monitoring unit again (position "ON" or "I") <strong>and</strong><br />

correctly close the cover of the control box (tighten the locking screws by<br />

h<strong>and</strong>).<br />

8. If the check was successful the generator is now ready for operation.<br />