03.09.2014 Views

AGENDA - Sunshine Coast Council

AGENDA - Sunshine Coast Council

AGENDA - Sunshine Coast Council

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Strategy and Planning Committee Agenda 16 February 2011<br />

INFRASTRUCTURE CONTRIBUTIONS<br />

8 The applicant must pay contributions towards trunk infrastructure in accordance with<br />

the following Planning Scheme Policies:<br />

(a) Planning Scheme Policy DC2 - Provision of Bikeways and Bicycle Facilities;<br />

(b) Planning Scheme Policy DC3 - Roads Infrastructure;<br />

(c) Planning Scheme Policy DC4 - Stormwater Quality;<br />

(d) Planning Scheme Policy DC5 - Public Parks Infrastructure;<br />

(e) Planning Scheme Policy DC6 - Land for Community Facilities;<br />

(f) Planning Scheme Policy DCA – Administration.<br />

For Material Change of Use of premises approvals the contributions must be paid prior<br />

to the commencement of use.<br />

The actual amount of the contribution must be calculated and paid in accordance with<br />

the Planning Scheme Policies and variations due to indexation current at the time of<br />

payment.<br />

FUTURE COMMUNITY TITLES SCHEME<br />

9 The applicant must ensure that the following are provided prior to the commencement<br />

of use:<br />

(a)<br />

A letterbox for each unit and one for the Body Corporate clearly marked with<br />

the street and unit number. The letterbox structure must be located within the<br />

property at the front boundary and integrated with the proposed landscaping<br />

(b) Clothes drying areas and facilities for each unit (external clothes drying areas<br />

must not be visible from the road)<br />

(c) Separate electricity meters for each unit<br />

10 Prior to <strong>Council</strong>’s endorsement of any Community Titles Scheme in relation to the<br />

subject land, all <strong>Council</strong> donated infrastructure required by this approval, and as<br />

defined in conditions contained herein, must be completed and have been accepted<br />

‘On Maintenance’ in accordance with <strong>Council</strong>’s Planning Scheme Policy No. 5 -<br />

Operational Works<br />

UTILITIES<br />

11 The applicant is responsible for the alteration, relocation or re-instatement of public<br />

utility services, stormwater drainage structures, driveways, landscaping and other<br />

features affected by the development works. Any alterations or repairs of existing<br />

infrastructure required as a result of the development are to be completed at no<br />

expense to <strong>Council</strong> or the service provider<br />

12 The applicant must ensure the development site is connected to supply in<br />

accordance with Planning Scheme Policy No.5 – Operational Works and must be<br />

designed by a Registered Professional Engineer of Queensland (RPEQ) experienced<br />

in electrical reticulation engineering<br />

COMMUNITY SAFETY AND SECURITY<br />

13 The applicant must amend the plans to replace the solid building facade of the<br />

eastern side (Medical Centre) with glass or clear glazed windows<br />

14 The proposed pathway along the eastern boundary of the site must be adequately lit<br />

at night to prevent concealment opportunities<br />

VISUAL AMENITY<br />

15 The applicant must amend the plans in accordance with the following requirements:<br />

(a) Replace the solid balustrades of the first floor balconies with glass<br />

(b) The solid dividing wall between the two balconies above the maximum<br />

balustrade height at first floor level must be set back a minimum of 5m from<br />

the front boundary. The remainder of the dividing wall is to have a height no<br />

greater than the maximum balustrade height<br />

Page 112

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!