Strategy and Planning Committee Agenda 16 February 2011<br />
d) The Environmental Protection Regulation 2008 prescribes specific Environmentally<br />
Relevant Activities e.g. Extractive & Screening Activities (dredging), Chemical<br />
Storage (service stations) which require a MCU ERA approval in accordance with the<br />
Sustainable Planning Act 2009, and Operators Registration Certificate in accordance<br />
with the Environmental Protection Act 1994. It is the applicant’s responsibility to<br />
ensure that where these activities are proposed in subsequent development<br />
applications, referral is made to the appropriate concurrence agency for assessment.<br />
e) It is a requirement of the Environmental Protection Act 1994 that if an owner or<br />
occupier of land becomes aware a Notifiable Activity (as defined by Schedule 2 of the<br />
Environmental Protection Act 1994) is being carried out on the land or that the land<br />
has been affected by a hazardous contaminant, they must, within 30 days after<br />
becoming so aware, give notice to the Department of Environment & Resource<br />
Management’s Contaminated Land Unit.<br />
f) The property is located within an area identified as a potential area of acid sulfate<br />
soils. As such, the applicant shall be responsible for implementing all necessary<br />
measures so as to minimise the disturbance of potential acid sulfate soils. Where it is<br />
known or suspected that acid sulfate soils are discovered, i.e. during earthworks,<br />
construction of footings and foundations, etc appropriate measures must be<br />
implemented to prevent the release of contaminated soils and run-off from the site.<br />
g) Road reserves widths and indicative cross sections may require widening to cater for<br />
stormwater treatment devices located within verges.<br />
Further Permits<br />
• Development Permit for Reconfiguring a Lot.<br />
• Development Permit for Operational Works (bulk earthworks).<br />
Page 96