Strategy and Planning Committee Agenda 16 February 2011<br />

i) location of all infrastructure above 50 year Average Return<br />

Interval flood event level (play equipment, BBQs and shelters,<br />

toilet block, etc, in accordance with <strong>Council</strong>’s relevant Policy).<br />

b) General<br />

i) provision of a report prepared and certified by a biologist or<br />

equivalent that demonstrates to the satisfaction of <strong>Council</strong>’s<br />

Delegate that there are no adverse impacts on the ecological<br />

values and functioning of the wetland areas;<br />

ii) details of proposed filling and extent of batter profiles with park<br />

boundaries / impact on vegetation and wetland;<br />

iii) exclusion of all stormwater treatment devices, sewerage pump<br />

stations and padmount transformers from Trunk parks;<br />

iv) details of coastal pathway;<br />

v) creation of a continuous 25 metre minimum width open space<br />

biting insect buffer strip shall be provided along the sites south<br />

and south eastern interface with the adjacent riparian<br />

vegetation zone. This 25 metre strip shall be made up by<br />

provision of road reserve (pavement and verge), pathway and<br />

open space park. The open space buffer shall be clear of biting<br />

insect harbouring vegetation, with the exception of<br />

mown/slashed grass and street trees approved under<br />

operational works – landscaping;<br />

vi) rehabilitation of the adjacent riparian corridor (vegetation buffer<br />

to Bells Creek) with local native species.<br />

The Open Space Strategy is to be assessed by <strong>Council</strong> and amendments to the<br />

Strategy conditioned as part of the first stage of subdivision.<br />

51. The existing power transmission lines extending from Booker Parade across the tidal<br />

inlet and along the unnamed road adjacent to Bells Creek must be removed and<br />

incorporated with the planned electrical reticulation network for the development area<br />

and undertaken in conjunction with operational works. Relocation works must ensure<br />

connection with the transmission lines crossing Bells Creek is maintained, with all<br />

works to comply with the requirements of the electricity authority. Details of<br />

relocation and reconnection works must be provided as part of the rehabilitation plan<br />

associated with the Open Space Strategy.<br />

MOSQUITO AND BITING INSECTS<br />

52. A continuous 25 metre minimum width open space biting insect buffer strip shall be<br />

provided along the sites south and south eastern interface with the adjacent riparian<br />

vegetation zone. This 25 metre strip shall be made up by provision of road reserve<br />

(pavement and verge), pathway and open space park. The open space buffer shall<br />

be clear of biting insect harbouring vegetation, with the exception of mown/slashed<br />

grass and street trees approved under operational works – landscaping;<br />

53. The layout, design and construction of this development shall be such that the<br />

development minimises the risk to public health from nuisance biting insects. At the<br />

time application is made for subsequent development applications, details shall be<br />

provided for all proposed biting insect mitigation measures which shall include, but<br />

not be limited to the following;<br />

I. biting insect proof screens to be fitted to doors and windows of all<br />